Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
269-10.jpg
269-10176 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
040804_155910.jpg
040804 155910176 viewsNelson Point, empty BHP ore waggon 1354 is a Comeng WA build from a batch of two hundred and twenty-six in 1973/74. Side view of waggon with resheeted side walls. 4th of August 2004.
110620_1965r.jpg
110620 1965r176 viewsWalla Siding, comparison between two BHP ore waggons loaded with Yandi fines of the Golynx design type, 8410 was built in November 2001 for bottom discharge on the Goldsworthy system with serial number 950088-340, while 6834 was built in 2008. The burn or weld marks are still visible on 8410 from when it was in GML service, now converted for rotary service, noticed the filled in end and the angle section along the top edge for support. 20th of June 2011.
222-29.jpg
222-29175 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie powers away with an empty train with 7091 following a crew change with a loaded train.
224-29.jpg
224-29175 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
226-14.jpg
226-14175 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
226-30.jpg
226-30175 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.
227-23.jpg
227-23175 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
228-29.jpg
228-29175 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
229-26.jpg
229-26175 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
230-03.jpg
230-03175 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
230-36.jpg
230-36175 viewsYandi Two balloon loop, Comeng built ore car 1309 one of 226 cars ordered in 1973, note the ladder. Loaded with Yandi Fines ore. Geodata -22.718338, 119.039909 .
235-10.jpg
235-10175 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
040805_095709.jpg
040805 095709175 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
040806_091220.jpg
040806 091220175 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
040810_144906.jpg
040810 144906175 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 8701, originally built for Goldsworthy Mining as no. 1, renumbered by Mt Newman as 8701, one five waggons built for Goldsworthy Mining.
050412_0760.jpg
050412 0760175 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 515.
050412_0773.jpg
050412 0773175 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
050518_2077.jpg
050518 2077175 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 751.
050518_2115.jpg
050518 2115175 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view.
4019 files on 201 page(s) 121

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional