Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
100717_0694.jpg
100717 0694259 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 as these waggons have Barber bogies and not Chinese castings, view of B end and handbrake and rail string support.
110411_09986.jpg
110411 09986259 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0008 one of six such tank waggons built in 1970-71.
110411_09994.jpg
110411 09994259 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
110411_10015.jpg
110411 10015259 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
150523_8208.jpg
150523 8208259 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
150523_8222.jpg
150523 8222259 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggons 0037 and 0033, both from a second batch delivered in 2015 with safety slogan 'Safety is a core value' and 'Don't drive tired'.
100330_8066.jpg
100330 8066259 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 30th March 2010.
170728_09690.jpg
170728 09690259 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
241-24.jpg
241-24259 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation with two C36-7M units 5506 and 5510 also awaiting removal from site. June 2002.
243-12.jpg
243-12259 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
080116_1374.jpg
080116 1374259 viewsChapman Siding, FMG master waggon 2396 tare 22.9 tonnes coupled with Janney Type F Interlock couplers and CSR type bogie. Built by CSR (China Southern) Zhuzhou Rolling Stock Works in China during 2007. 16th January 2008.
080304_2187.jpg
080304 2187259 viewsThomas Yard, down the rail welding end, side view of control waggon 2238, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2194.jpg
080304 2194259 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1619 slave and 2620 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-35.jpg
246-35259 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
247-06.jpg
247-06259 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
247-33.jpg
247-33259 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 and was originally an AE Goodwin built M636 ALCo serial C-6041-4 new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982, compare to second unit 9410 with a Comeng style large flat fuel tank. Location is here.22nd May 2002.
251-12.jpg
251-12259 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5511 builders plate. 22nd April 2000.
251-17.jpg
251-17259 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 idles away outside the shop. 22nd April 2000.
210510_1140.jpg
210510 1140259 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
255-07.jpg
255-07259 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.
5869 files on 294 page(s) 122

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional