Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050412_0767.jpg
0533 Magor USA 050412 0767395 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
050518_2165.jpg
0523 Magor USA 050518 2165395 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
051001_5623.jpg
6705 051001 5623395 viewsFlash Butt yard, BHP flat waggon 6705 ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA, 3/4 view.
051001_5727.jpg
6702 Mt Newman Mining Workshops 051001 5727395 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
060501_3875.jpg
0702 Difco USA 060501 3875395 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, side dump waggon 702.
080621_2729.jpg
6214 Gemco 080621 2729395 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
110411_10001.jpg
0014 Comeng WA 110411 10001395 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
110411_10026.jpg
0016 Comeng WA 110411 10026395 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
110619_1883.jpg
6202 Comeng WA 110619 1883395 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #13, 6202, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
243-27.jpg
243-27395 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
243-29.jpg
243-29395 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080304_2184.jpg
01185 080304 2184395 viewsThomas Yard, down the rail welding end, side view of slave waggon 1185, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2191.jpg
02336 080304 2191395 viewsThomas Yard, down the rail welding end, side view of control waggon 2336, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
247-27.jpg
247-27395 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
249-04.jpg
249-04395 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
255-27.jpg
255-27395 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
256-25.jpg
256-25395 viewsMaitland Siding, Robe River CM40-8M unit 9422 on an empty train. 9422 was built by Comeng NSW as an ALCo M636 model in August 1977 with serial C6103-2 and delivered to Robe River in November 1977. 22nd February 1979 9422 was lead unit on empty train involved in head on collision at Siding One, it was repaired at Cape Lambert and returned to service. It was eventually rebuilt by Goninan in March 1993 to become an CM40-8M with serial number 8297-03 / 93-138. May 2002.
268-27.jpg
268-27395 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
220-32.jpg
220-32394 viewsGoldsworthy Junction, trailing shot of the afternoon departure for Yandi mine behind the standard double Dash 8 power consist, heading towards Bing Siding with the Flashbutt Yard visible in the distance.
226-24.jpg
226-24394 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
6217 files on 311 page(s) 133

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional