Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
060429_3732.jpg
060429 3732252 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, with asset number 6506-017.
060618_6219.jpg
060618 6219252 viewsFlash Butt yard, modified original Magor USA built Oroville waggons 567 and 589, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
060710_6301.jpg
060710 6301252 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 589, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
050625_3595.jpg
050625 3595252 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
050625_3601.jpg
050625 3601252 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
050801_4756.jpg
050801 4756252 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
050801_4762.jpg
050801 4762252 viewsFlash Butt yard, Barclay Mowlem ballast regulator. 1st August 2005.
060326_3214.jpg
060326 3214252 viewsBing Siding, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 runs towards Nelson Point on the mainline with the new western mainline in the foreground and Bing passing track on the right. 26th March 2006.
080621_2716.jpg
080621 2716252 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6104 in service with the rail recovery and transport train as waggon #6.
080621_2723.jpg
080621 2723252 viewsTabba South, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
081217_0454.jpg
081217 0454252 viewsWoodstock Siding, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6105 in service with the rail recovery and transport train as waggon #2.
100717_0675.jpg
100717 0675252 viewsFlash Butt yard, new rail stock carrier waggon 6043, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0678.jpg
100717 0678252 viewsFlash Butt yard, new rail stock carrier waggon 6035, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0696.jpg
100717 0696252 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
150314_7748.jpg
150314 7748252 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0027, one of a batch of ten built in 2014.
150523_8210.jpg
150523 8210252 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
150523_8212.jpg
150523 8212252 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
150523_8220.jpg
150523 8220252 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0043, one of a second batch delivered in 2015 with safety slogan 'ASAP - As safe as possible'.
171121_0971.jpg
171121 0971252 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
241-12.jpg
241-12252 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
5872 files on 294 page(s) 138

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional