Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
160128_00334.jpg
160128 0033493 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0025, one of a batch of ten built in 2014.
160128_00338.jpg
160128 0033893 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0040, one of a second batch delivered in 2015 with safety slogan 'Think Safe - Act Safe'.
170510_8285.jpg
170510 828593 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
241-29.jpg
241-2993 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.
110620_2276.jpg
110620 227693 viewsChapman, FMG TK type fuel tank waggon TK 04 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
247-06.jpg
247-0693 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
267-25.jpg
267-2593 viewsOn approach to the 39 km Detector Site the Sundowner Special runs along the Newman Mainline behind BHP Iron Ore's Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 with sister 5653 on the rear. Friday 12th of April 2002.
267-28.jpg
267-2893 views39 km Newman line, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 slows as it brings the Sundowner special to a stop at the 39 km detector site on the Newman mainline.
The trailing unit is 5653.
This was a special for the 25 years of the Alstom / BHP service agreement.
Friday 12th of April 2002.
267-33.jpg
267-3393 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
225-21.jpg
225-2192 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
227-21.jpg
227-2192 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
229-22.jpg
229-2292 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-30.jpg
229-3092 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
230-20.jpg
230-2092 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
230-23.jpg
230-2392 viewsYandi Two balloon loop, cab side view of Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 with ALCo Hi-Ad bogie. Geodata -22.718338, 119.039909 .
230-25.jpg
230-2592 viewsYandi Two balloon loop, view of the stockpile area and pedestal stacker, train being loaded at 1.2 km/h behind two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. Geodata -22.718338, 119.039909 .
230-36.jpg
230-3692 viewsYandi Two balloon loop, Comeng built ore car 1309 one of 226 cars ordered in 1973, note the ladder. Loaded with Yandi Fines ore. Geodata -22.718338, 119.039909 .
231-32.jpg
231-3292 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.
233-04.jpg
233-0492 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
234-33.jpg
234-3392 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
3980 files on 199 page(s) 139

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional