Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
060429_3728.jpg
060429 3728354 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060501_3868.jpg
060501 3868354 viewsTabba Siding, ballast plough waggon converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
060501_3893.jpg
060501 3893354 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with ballast.
060501_3894.jpg
060501 3894354 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, the last 'long' side dump waggon 704.
060618_6221.jpg
060618 6221354 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 589, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
050801_4753.jpg
050801 4753354 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper, shows original owner B & M Whitmore Pty Ltd. 1st August 2005.
100717_0695.jpg
100717 0695354 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 as these waggons have Barber bogies and not Chinese castings, view of B end and handbrake and rail string support.
110208_9444.jpg
110208 9444354 viewsFlash Butt yard, new rail stock carrier waggon 6038 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09994.jpg
110411 09994354 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
110411_10026.jpg
110411 10026354 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
110411_10029.jpg
110411 10029354 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng for BP as RTC 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
141124_7092.jpg
141124 7092354 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on 24th November 2014.
241-32.jpg
241-32354 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
246-04.jpg
246-04354 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. The Boat Beach Rd can be seen on the extreme right. 22nd May 2002.
246-27.jpg
246-27354 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
247-06.jpg
247-06354 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
243-34.jpg
243-34354 viewsNelson Point departure yard, hood view of BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan WA in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
248-02.jpg
248-02354 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery from 1994 still looking good some ten years later. Approximate location. 24th April 2004.
248-03.jpg
248-03354 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery from 1994 still looking good some ten years later. Approximate location. 24th April 2004.
252-36.jpg
252-36354 viewsBoodarie, a loaded Yarrie train is crossing the Roebourne Rd at the 9.6 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
6096 files on 305 page(s) 139

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional