Most viewed - Pilbara negative and digital Albums - Iron Ore |

200914 iPhone IMG 8833426 viewsPilbara Railways Historical Society, driver position view of Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

041014 122446426 viewsPilbara Railways Historical Society, the builders plate from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Donated to the Society around 1998? 14th October 2004.
|
|

207-14425 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
|
|

196-07424 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
|
|

203-00424 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.
|
|

1048 001424 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
|
|

8335 roster rhs 040627 135444424 viewsNelson Point, Ex Southern Pacific SD40T-2 loco 8335 serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, this unit was purchased as a spares source for the other SD40 style units. The T signifies that it is a Tunnel motor with a modified radiator intake to allow 'cool' running through the Sierra Nevada tunnels. And the 'M' with a lighting rod through it meant that it was a master unit for radio controlled helpers, used in the Tehachapi mountains. 27th of June 2004.
|
|

16953423 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible. October 1993.
Jim Bisdee photo.
|
|

242-37423 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of second person or observers side of cab. May 2002.
|
|

219-05421 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|

150508 8116421 viewsFMG Solomon Line, empty train lead by triple combination of General Electric Dash 9-44CW 004 serial 58181, EMD SD90MAC-H 916 serial 976833-22 and EMD SD70ACe 710 serial 20118693-002 power through the hills around the Bea Bea Creek area. Geodata: -22.0528200 118.7132450 .
|
|

196-03420 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

207-08420 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

150522 8184420 viewsWedgefield, Sims Metal yard, no. 2 end of Goninan WA rebuild CM40-8M unit 5638 serial 8281-02/92-127, for full details of these units past lives see here .
|
|

160128 00410420 viewsWedgefield, Sims Metal Yard, this image shows three different types of the Dash 8 units. On the left 5654 is a GE model CM40-8M Goninan rebuild of a Comeng built ALCo M636, in the middle is new built GE model CM39-8 by Goninan 5633 and on the right is 5636 which is a GE model CM40-8M Goninan rebuild of an AE Goodwin built ALCo C636.
|
|

1049 001420 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining with sister unit 5632 inline behind it.
Jim Bisdee photo.
|
|

150522 8153419 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 one of a pair of new Goninan WA built CM40-8 units has already had most of the hood removed and the V16 7FDL prime mover is visible, sister unit 5647 sit along side with the same fate coming up next.
|
|

150523 8242419 viewsNelson Point Yard, loaded ore waggon 5073, a Golynx style waggon built by Goninan, serial no. 950126-114 in 2004 with 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
|
|

041014 141930418 viewsPilbara Railways Historical Society, view along the passenger carriages, closest is the 'Conference Car' with SV 4 still visible, originally built by Clyde Engineering at Granville NSW in 1935 for the NSWGR as a second class railway carriage FS type FS 2010. In 1975 it was purchased by Hamersley Iron and converted to an inspection vehicle SV 4. When donated to the Society it was repurposed as a conference car. 14th October 2004.
|
|

223-15417 viewsPossum Siding, Hamersley Iron loco 7080 a General Electric built Dash 9-44CW model serial 47759 second unit rear view. 21st October 2000.
|
|
5618 files on 281 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
14 |  |
 |
 |
 |
 |
 |
 |
|