Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
231-23.jpg
231-2391 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
234-27.jpg
234-2791 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
234-34.jpg
234-3491 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
235-23.jpg
235-2391 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo.
235-36.jpg
235-3691 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
236-22.jpg
236-2291 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
050412_0767.jpg
050412 076791 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
050518_2105.jpg
050518 210591 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 752.
050518_2107.jpg
050518 210791 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 759.
050518_2108.jpg
050518 210891 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 759.
050518_2113.jpg
050518 211391 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746.
050518_2140.jpg
050518 214091 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741, shows bogie detail, ATSF CS-3000 Ride Control Unit bogie casting with CFCLA id of CQFE 056.
050518_2172.jpg
050518 217291 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2177.jpg
050518 217791 viewsBing Siding. Side view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2187.jpg
050518 218791 viewsBing Siding. Side view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050704_3997.jpg
050704 399791 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
050704_3998.jpg
050704 399891 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
050801_4764.jpg
050801 476491 viewsFlash Butt yard, rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
050801_4769.jpg
050801 476991 viewsFlash Butt yard, rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in January 1977 under order no. 07-M-282 RY.
051001_5713.jpg
051001 571391 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, builders plate, bogie and ladder, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
3980 files on 199 page(s) 142

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional