Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
228-26.jpg
228-26352 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
233-01.jpg
233-01352 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
234-27.jpg
234-27352 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
234-36.jpg
234-36352 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
235-13.jpg
235-13352 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
235-27.jpg
235-27352 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time, note the much larger style fuel tank fitted to the Comeng built M636 ALCo units and also the later marigold style BHP logo.
235-34.jpg
235-34352 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
236-20.jpg
236-20352 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
236-26.jpg
236-26352 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6072 'Hesta' serial 51064 sits out the front with new windscreen protectors or 'blinkers' fitted, note cab window missing.
040806_102956.jpg
040806 102956352 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
050518_2095.jpg
050518 2095352 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 734.
050518_2163.jpg
050518 2163352 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
051001_5717.jpg
051001 5717352 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, builders plate, a Scotts of Ipswich Qld built flat waggon on 12th September 1970.
050412_0782.jpg
050412 0782352 viewsHesta Siding south, BHP's EX 01 high rail excavator, built in France by Geismar as a KGT 4RS model with serial 4559. 12th April 2005.
050625_3656.jpg
050625 3656352 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 in out on the passing track. 25th June 2005.
050625_3813.jpg
050625 3813352 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, three Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
050625_3819.jpg
050625 3819352 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
060326_3202.jpg
060326 3202352 viewsBing Siding, south arrival with the mainline in the foreground as ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401 takes the passing track. 26th March 2006.
080621_2729.jpg
080621 2729352 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
150523_8222.jpg
150523 8222352 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggons 0037 and 0033, both from a second batch delivered in 2015 with safety slogan 'Safety is a core value' and 'Don't drive tired'.
6096 files on 305 page(s) 142

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional