Most viewed - Pilbara negative and digital Albums - Iron Ore |

110411 09980166 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

110411 09995166 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

110411 10004166 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

110411 10031166 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

110411 10032166 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

130720 1437166 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed.
|
|

150523 8207166 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

171121 0968166 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator car or waggon. Looks to be a converted 85 foot waggon. This used to be operational in the US as LMIX 602. 21st November 2017.
|
|

241-25166 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

241-27166 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096--4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side front view of the cab with pilot missing. June 2002.
|
|

080116 1374166 viewsChapman Siding, FMG master waggon 2396 tare 22.9 tonnes coupled with Janney Type F Interlock couplers and CSR type bogie. Built by CSR (China Southern) Zhuzhou Rolling Stock Works in China during 2007. 16th January 2008.
|
|

080124 1631166 viewsChapman Siding, side view of control waggon 2314, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080304 2178166 viewsThomas Yard, down the rail welding end, side view of slave waggon 1333, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2189166 viewsThomas Yard, down the rail welding end, side view of control waggon 2328, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-33166 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

249-20166 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

252-12166 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
|
|

255-35166 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.
|
|

267-29166 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
|
|

268-28166 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
143 |  |
 |
 |
 |
 |
 |
 |
|