Most viewed - Pilbara negative and digital Albums - Iron Ore |

100717 0658307 viewsFlash Butt yard, new rail stock carrier waggon 6042, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0677307 viewsFlash Butt yard, new rail stock carrier waggon 6022, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

150619 9078307 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
|
|

243-07307 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

243-20307 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2180307 viewsThomas Yard, down the rail welding end, side view of slave waggon 1341, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2184307 viewsThomas Yard, down the rail welding end, side view of slave waggon 1185, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

110620 2279307 viewsChapman, FMG TK type fuel tank waggon TK 07 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

252-33307 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

210322 9584307 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

255-20307 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

255-21307 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

256-25307 viewsMaitland Siding, Robe River CM40-8M unit 9422 on an empty train. 9422 was built by Comeng NSW as an ALCo M636 model in August 1977 with serial C6103-2 and delivered to Robe River in November 1977. 22nd February 1979 9422 was lead unit on empty train involved in head on collision at Siding One, it was repaired at Cape Lambert and returned to service. It was eventually rebuilt by Goninan in March 1993 to become an CM40-8M with serial number 8297-03 / 93-138. May 2002.
|
|

257-20307 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

267-11307 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train units Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 and 5645 'Sherlock' serial number 8281-11 / 92-134 104 waggons from the lead with 104 waggons trailing. The line curving away to the left is the Goldsworthy line to Boodarie and Finucane Island. 1247 hrs Friday 12th of April 2002.
|
|

269-16307 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

269-19307 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

221-25306 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

228-22306 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
|
|

229-21306 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
143 |  |
 |
 |
 |
 |
 |
 |
|