Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
110411_10029.jpg
0020 Comeng NSW 110411 10029388 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng for BP as RTC 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
150314_7742.jpg
0019 Comeng NSW / RTC 150314 7742388 viewsBing Siding, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
150523_8210.jpg
0044 CNR - QRRS China 150523 8210388 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
243-12.jpg
243-12388 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
243-21.jpg
243-21388 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080124_1630.jpg
01311-02312 080124 1630388 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
247-34.jpg
247-34388 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
248-18.jpg
248-18388 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Behind it is sister unit 9426. Approximate location. 24th April 2004.
253-04.jpg
253-04388 viewsDugite near the 64 km on the Dampier - Tom Price railway, as an empty Hamersley Iron ore train sits in the passing track behind General Electric 9-44CW unit 7066 with serial number 47745 as a loaded rolls by on the mainline behind sister 9-44CW unit 7078 serial number 47757. Both of these units are from the original order and built in October 1994.
254-22.jpg
254-22388 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
225-24.jpg
225-24387 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
231-32.jpg
231-32387 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.
050518_2142.jpg
CHQY 741 050518 2142387 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741, close up of bogie, shows bogie detail, ASF Ride Control bogie casting with CFCLA id of CQFE 055.
050801_4772.jpg
6015 Comeng WA 050801 4772387 viewsFlash Butt yard, rail recovery and transport train flat waggon #26, 6015, built by Comeng WA in November 1971, view of original style number.
050801_4731.jpg
050801 4731387 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
051001_5681.jpg
051001 5681387 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
080621_2718.jpg
6106 Mt Newman Mining Workshops 080621 2718387 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6106 in service with the rail recovery and transport train as waggon #4.
110411_10019.jpg
0015 Comeng WA 110411 10019387 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
150314_7741.jpg
0030 CNR - QRRS China 150314 7741387 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0030, the final member of a batch of ten built in 2014.
243-19.jpg
243-19387 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
6217 files on 311 page(s) 145

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional