Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
110208_9430.jpg
110208 9430349 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110411_10017.jpg
110411 10017349 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
110619_1880.jpg
110619 1880349 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #10, 6204, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
110619_1887.jpg
110619 1887349 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #17, 6016 with registered number 6506-016, a Comeng WA built flat waggon from 1971.
150314_7750.jpg
150314 7750349 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
150619_9086.jpg
150619 9086349 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
171121_0970.jpg
171121 0970349 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
241-29.jpg
241-29349 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.
080304_2206.jpg
080304 2206349 viewsThomas Yard, down the rail welding end, side view of control waggon 2528, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
248-13.jpg
248-13349 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south with the signal marker boards are in the distance. Approximate location. 24th April 2004.
249-24.jpg
249-24349 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
249-35.jpg
249-35349 viewsBurrup Peninsula gas plant, view of plant and flare tower. Approximate location. 18th December 1999.
252-33.jpg
252-33349 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
210322_9586.jpg
210322 9586349 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
254-22.jpg
254-22349 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
256-26.jpg
256-26349 viewsMaitland Siding, Robe River CM40-8M unit 9418 on an empty train. 9418 was built by ALCo Schenectady NY USA as an ALCo C630 model in October 1967 with serial number 3486-02 for the Chesapeake and Ohio Railroad Company (USA) with road number 2101. It was purchased by Morrison Knudsen for Robe River (along with three sister units) and delivered in January 1975 and repainted and renumbered as 9418 on arrival. 9418 was rebuilt by Goninan WA in December 1990 to become an CM40-8M model with serial number 8109-12 / 90-118. May 2002.
256-30.jpg
256-30349 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
257-03.jpg
257-03349 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6035-2 and road number 5461 and assigned new serial number 4839-03 / 87-072. It was delivered in Mount Newman Mining orange and was named Port Hedland. Late 2001.
267-06.jpg
267-06349 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
268-11.jpg
268-11349 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
6096 files on 305 page(s) 148

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional