Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
180616_1846.jpg
180616 1846351 viewsMaitland Siding, a loaded Mesa A train runs along the mainline behind the standard double General Electric ES44ACi units that operate the Robe Valley trains, Rio Tinto loco 9113 with serial 62544 a GE Erie built GE model ES44ACi from the 2nd order in Rio Tinto Stripes livery leads sister unit 9114 serial 62545 at the 96 km. 19th June 2018. GeoData.
219-03.jpg
219-03350 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
223-28.jpg
223-28350 viewsPossum Siding, trailing view of Hamersley Iron General Electric built Dash 9-44CW units 7072 in the lead and 7074 serial 47753 with a loaded train ex Marandoo having just completed a crew change with an empty train. 21st October 2000.
150522_8165.jpg
150522 8165350 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
250-34.jpg
250-34350 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. 22nd October 2000.
203-08.jpg
203-08349 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
150508_8116.jpg
150508 8116349 viewsFMG Solomon Line, empty train lead by triple combination of General Electric Dash 9-44CW 004 serial 58181, EMD SD90MAC-H 916 serial 976833-22 and EMD SD70ACe 710 serial 20118693-002 power through the hills around the Bea Bea Creek area. Geodata: -22.0528200 118.7132450 .
207-20.jpg
207-20348 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.
218-04.jpg
218-04348 viewsDe Grey River, Toyota Land Cruiser Toy Titan, 1994 HJ75 series tray back.
218-11.jpg
218-11348 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
223-22.jpg
223-22348 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000
151111_9493.jpg
151111 9493348 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
151111_9500.jpg
151111 9500348 viewsAt the 47 km post on the Cape Lambert line a loaded train runs along on the West Mainline behind 7050 and 7057 both General Electric Dash 9-44CW units with serials of 57101 and 55882 and the last General Electric ES44DCi 8199, serial 61858.
207-12.jpg
207-12347 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
150522_8167.jpg
150522 8167347 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992 with a Goninan ALCo rebuild 5657 beside them.
3091_roster_lhs_040627_080506.jpg
3091 roster lhs 040627 080506347 viewsNelson Point, BHP Billiton's EMD SD40R unit 3091 serial number 31496 / 7861-6 and was originally Southern Pacific SD40 unit SP8415 built at McCook Illinois in February 1966, rebuilt to SD40R by SP. 27th of June 2004.
242-18.jpg
242-18346 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
218-15.jpg
218-15345 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
219-11.jpg
219-11345 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 left hand side cab and bogie view.
200914_iPhone_IMG_8833.jpg
200914 iPhone IMG 8833345 viewsPilbara Railways Historical Society, driver position view of Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
4019 files on 201 page(s) 15

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional