Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
080304_2191.jpg
080304 219148 viewsThomas Yard, down the rail welding end, side view of control waggon 2336, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2192.jpg
080304 219248 viewsThomas Yard, looking south, long rake of waggons being run up and down the mainline to keep the wheels turning. 4th March 2008.
080304_2197.jpg
080304 219748 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1059 slave and 2060 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2206.jpg
080304 220648 viewsThomas Yard, down the rail welding end, side view of control waggon 2528, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
231-29.jpg
231-2947 viewsYandi Two balloon loop, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5652 on the left is the lead, while 5650 on the right is second unit. GeoData.
231-30.jpg
231-3047 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
051001_5681.jpg
051001 568147 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
080124_1624.jpg
080124 162447 viewsChapman Siding, side view of control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
080124_1625.jpg
080124 162547 viewsChapman Siding, new FMG ore waggon pair 1255 slave and 2256 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
080304_2175.jpg
080304 217547 viewsThomas Yard, down the rail welding end, side view of slave waggon 1209, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2176.jpg
080304 217647 viewsThomas Yard, down the rail welding end, side view of slave waggon 1167, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2181.jpg
080304 218147 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2193.jpg
080304 219347 viewsThomas Yard, looking north, long rake of waggons being run up and down the mainline to keep the wheels turning. 4th March 2008.
080304_2196r.jpg
080304 2196r47 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1611 slave and 2612 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2205.jpg
080304 220547 viewsThomas Yard, down the rail welding end, side view of slave waggon 1527, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-13.jpg
246-1347 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
269-14.jpg
269-1447 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
225-22.jpg
225-2246 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
231-24.jpg
231-2446 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.
231-25.jpg
231-2546 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.
3610 files on 181 page(s) 151

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional