Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
269-15.jpg
269-1551 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
269-25.jpg
269-2551 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
040912_132238r.jpg
040912 132238r51 viewsNelson Point, view from above of BHP ore waggon 8415 showing the internal plates fitted for the bottom discharge arrangement of the Goninan WA build of the Golynx design built in November 2001 as a bottom discharge waggon for Goldsworthy service with serial number 950088-345. 12th of September 2004.
246-05.jpg
246-0550 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
247-16.jpg
247-1650 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper. 22nd May 2002.
249-22.jpg
249-2250 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream following Cyclone John on 18th December 1999. Approximate location.
210510_1117.jpg
210510 111750 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type straddle crane carrying rail waggon RTS 003 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
268-14.jpg
268-1450 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
268-35.jpg
268-3550 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
080304_2170.jpg
080304 217049 viewsThomas Yard, down the rail welding end, rake of waggons built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007 with the welding yard behind them. 4th March 2008.
246-10.jpg
246-1049 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-28.jpg
246-2849 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
246-33.jpg
246-3349 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
247-12.jpg
247-1249 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
248-15.jpg
248-1549 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.
248-25.jpg
248-2549 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.
249-02.jpg
249-0249 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
249-03.jpg
249-0349 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
267-30.jpg
267-3049 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
246-04.jpg
246-0448 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. The Boat Beach Rd can be seen on the extreme right. 22nd May 2002.
3681 files on 185 page(s) 156

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional