Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
222-36.jpg
222-36241 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.
226-20.jpg
226-20241 viewsShaw North, 216.5 km, all the departure signals in a row looking across the cutting. SWN 4R, SWN 4, SWN 6 and SWN 6R for north bound movements. GeoData.
226-24.jpg
226-24241 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
226-26.jpg
226-26241 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
233-14.jpg
233-14241 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
234-22.jpg
234-22241 viewsYandi Two, BHP Iron Ore Goninan rebuild CM39-8 GE unit 5630 'Zeus' serial 5831-09 / 88-079 is second unit on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Rear three quarter view. Circa 1998.
234-36.jpg
234-36241 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
235-27.jpg
235-27241 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time, note the much larger style fuel tank fitted to the Comeng built M636 ALCo units and also the later marigold style BHP logo.
236-34.jpg
236-34241 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted.
050518_2158.jpg
050518 2158241 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2176.jpg
050518 2176241 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5682.jpg
051001 5682241 viewsBoodarie, the Steel Train or rail recovery and transport train holds the main towards Finucane Island, a loaded rake of Comeng WA and Scotts of Ipswich Qld flat waggons make up the consist.
050625_3819.jpg
050625 3819241 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
080621_2728.jpg
080621 2728241 viewsGillman Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
080621_2732.jpg
080621 2732241 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of B end with squeeze rollers and chutes raised.
100717_0684.jpg
100717 0684241 viewsFlash Butt yard, new rail stock carrier waggon 6037, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09995.jpg
110411 09995241 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_09996.jpg
110411 09996241 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_10009.jpg
110411 10009241 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
110619_1882.jpg
110619 1882241 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
5972 files on 299 page(s) 158

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional