Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
150505_7953.jpg
150505 7953596 viewsFMG Solomon Line, looking west with cutting to the right, 227.5 km grade crossing in the distance, track is curving away to the left in the background. Geodata: -22.0200283 118.5880600 .
16940.jpg
16940596 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143, rebuilt from Mt Newman Mining AE Goodwin built ALCo M636 unit 5482 serial G6061-3, being prepped for road haulage to Port Hedland. October 1993.
Jim Bisdee photo.
180616_1846.jpg
180616 1846596 viewsMaitland Siding, a loaded Mesa A train runs along the mainline behind the standard double General Electric ES44ACi units that operate the Robe Valley trains, Rio Tinto loco 9113 with serial 62544 a GE Erie built GE model ES44ACi from the 2nd order in Rio Tinto Stripes livery leads sister unit 9114 serial 62545 at the 96 km. 19th June 2018. GeoData.
268-34.jpg
268-34596 viewsAt the 39 km detection site with the Alstom 25-year special, view from the No. 1 End of the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
207-03.jpg
207-03595 viewsYandi One balloon loop, Comeng WA built ore waggon 1442 coupled to a Goninan style waggon 4146 on the empty side of the load-out tunnel, August 1999.
151111_9478.jpg
151111 9478594 viewsCape Lambert Yard, Hamersley Iron 7074, a General Electric built Dash 9-44CW serial 47753 from the original order in November 1994.
150505_7944.jpg
150505 7944594 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side, expanded view from 7942, access road visible at left. Geodata: -22.0525633 118.7199633 .
150505_7951.jpg
150505 7951594 viewsFMG Solomon Line, looking back east from the same spot as 7950. Repeater tower in distance. Geodata: -22.0398833 118.6280733 .
196-09.jpg
196-09593 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
207-17.jpg
207-17593 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
151111_9481.jpg
151111 9481593 viewsCape Lambert Yard, Chinese built Bradken ore cars, control car 20292 and slave car 25292.
16948.jpg
16948593 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
170915_0719.jpg
170915 0719592 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1012 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
242-21.jpg
242-21592 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of bogie. May 2002.
041014_142110.jpg
041014 142110592 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
041014_142738.jpg
041014 142738592 viewsPilbara Railways Historical Society museum, 5450 a USA built EMD model F7A serial 8970 and frame 3006-A9, built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. Donated to the Society in 1978. 14th October 2004.
219-03.jpg
219-03591 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
041225_064634.jpg
9101 Bradken 041225 064634590 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
196-11.jpg
196-11589 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
207-14.jpg
207-14589 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
6216 files on 311 page(s) 16

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional