060618_6219.jpg
060618 6219340 viewsFlash Butt yard, modified original Magor USA built Oroville waggons 567 and 589, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
060618_6220.jpg
060618 6220340 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 567, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
050801_4756.jpg
050801 4756340 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
051001_5672.jpg
051001 5672340 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the light buggy and rods. 1st October 2005.
051001_5676.jpg
051001 5676340 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
110606_1750.jpg
110606 1750340 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
110619_1882.jpg
110619 1882340 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
150314_7740.jpg
150314 7740340 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0030, the final member of a batch of ten built in 2014.
150314_7742.jpg
150314 7742340 viewsBing Siding, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
247-25.jpg
247-25340 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
210322_9581.jpg
210322 9581340 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 112 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
255-21.jpg
255-21340 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
257-19.jpg
257-19340 viewsFlash Butt yard bogie and radiator fan drive view of Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
268-16.jpg
268-16340 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
283-25.jpg
283-25340 viewsHarding Siding, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. 22nd of May 2002.
110620_2396r.jpg
110620 2396r340 viewsWalla, loaded BHP ore waggon 4001, an example built May 2005 of the Golynx design as built by Goninan WA in large numbers This Golynx body replaced an earlier Comeng waggon with the same number. 20th of June 2011.
110620_2479r.jpg
110620 2479r340 viewsWalla, loaded BHP ore waggon 4169 is a Goninan WA build from an order of one hundred and twenty-six waggons in 1997 with a tapered floor and rounded wall bottoms using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
233-04.jpg
233-04339 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
050412_0751.jpg
050412 0751339 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 532, originally in ore service before conversion to a ballast waggon.
050412_0759.jpg
050412 0759339 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
6096 files on 305 page(s) 160

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional