Most viewed - Pilbara negative and digital Albums - Iron Ore |

240701 2795336 viewsPilbara Railways Historical Society, from left, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. July 1, 2024.
|
|

224-31335 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

225-27335 viewsBing siding backtrack, a ballast consist of 17 GML bottom discharge waggons and 6 Difco side dump rip rap waggons, possibly an 'emergency' ballast train for the GML line following flood damage. GeoData.
|
|

227-02335 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.
|
|

234-31335 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking from 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

050412 0760335 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 515.
|
|

050518 2157335 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

051001 5651335 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, view of adjusting wheels for plough.
|
|

060618 6219335 viewsFlash Butt yard, modified original Magor USA built Oroville waggons 567 and 589, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
|
|

050625 3600335 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 with support road vehicle TM 10. 25th June 2005.
|
|

050801 4756335 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
|
|

051001 5676335 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
|
|

150619 9078335 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
|
|

252-17335 viewsRosella Junction looking south at the 251 km. The line to the left goes to Marandoo and Yandicoogina, the straight to Tom Price and Paraburdoo and the right heads to Brockman. Location is roughly here. 24th November 2001.
|
|

252-23335 viewsNelson Point cab side view of BHP Iron Ore's General Electric built AC6000 unit 6074 'Kalgan' serial number 51066 is shutdown near the wheel lathe. Early December 2001.
|
|

210510 1107335 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

255-21335 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

257-32335 viewsGoldsworthy Junction, empty train with second unit BHP Iron Ore loco 5632 'Poseidon' one of four new built GE CM39-8 model locomotives by Goninan in late 1998 with serial number 5831-11 / 88-081.
|
|

268-17335 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

283-28335 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead their 202 loaded ore waggons through the passing track at Siding 1 (Harding) following recent extension of the loop and renaming to Harding. The extension is at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
161 |  |
 |
 |
 |
 |
 |
 |
|