Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
248-03.jpg
248-0369 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery from 1994 still looking good some ten years later. Approximate location. 24th April 2004.
248-14.jpg
248-1469 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south back onto the mainline with the signal marker board DI19 for Dingo 19. Approximate location. 24th April 2004.
249-11.jpg
249-1169 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
251-19.jpg
251-1969 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 and yet to be named idles away outside the shop. 22nd April 2000.
210510_1134.jpg
210510 113469 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 019 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1140.jpg
210510 114069 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
256-27.jpg
256-2769 viewsMaitland Siding, Robe River CM40-8M unit 9419 on an empty train. 9419 was built by ALCo Schenectady NY USA as an ALCo C630 model in October 1967 with serial number 3486-03 for the Chesapeake and Ohio Railroad Company (USA) with road number 2102. It was purchased by Morrison Knudsen for Robe River (along with three sister units) and delivered in January 1975 and repainted and renumbered as 9419 on arrival. 9419 was rebuilt by Goninan WA in October 1990 to become an CM40-8M model with serial number 8109-10 / 90-117. May 2002.
110620_2490r.jpg
110620 2490r69 viewsWalla, loaded BHP ore waggon 1173, whilst numbered and the ends and sill are from Comeng WA 1971 build of one hundred and eighty-three waggons, the side walls have been totally replaced with rounded bottoms and Goninan style extra ribs. 20th of June 2011.
247-32.jpg
247-3268 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.
248-07.jpg
248-0768 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
249-07.jpg
249-0768 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
210510_1136.jpg
210510 113668 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 017 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
267-03.jpg
267-0368 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
268-09.jpg
268-0968 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
030712_143222.jpg
030712 14322268 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
247-14.jpg
247-1467 viewsCape Lambert overview of the railway workshops buildings and service shops for surface mining equipment. Approximate location of photo is here. 22nd May 2002.
247-36.jpg
247-3667 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
249-14.jpg
249-1467 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
249-26.jpg
249-2667 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
251-11.jpg
251-1167 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5511 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6035-4 and road number 5463 and assigned new serial number 4839-08 / 87-076. It was delivered in Mt Newman Mining orange and was named Port Hedland. 551 holds the dubious honour of being the first unit withdrawn following an engine failure in 1998. 22nd April 2000.
3980 files on 199 page(s) 162

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional