Most viewed - Pilbara negative and digital Albums - Iron Ore |

210322 9586235 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

255-03235 viewsSiding Three back track, Fairmont Tamper sleeper inserter machine. May 2002.
|
|

256-03235 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-24235 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister units 9420 and 9410 on a loaded train. May 2002.
|
|

257-18235 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

224-37234 viewsBing siding, mid-train remote on the afternoon Yandi departure 6075 serial 51067 a General Electric AC6000 built by GE at Erie departs south. GeoData.
|
|

228-25234 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

233-06234 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-05234 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-10234 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

234-25234 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking from 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

235-06234 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

236-23234 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 and 6077 beside it.
|
|

051001 5718234 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #26, 6015, a Comeng WA built flat waggon from 1971.
|
|

130720 1448234 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
|
|

150314 7744234 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0028, one of a batch of ten built in 2014.
|
|

243-01234 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2 stands in the morning sunlight. August 2003.
|
|

243-30234 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

243-31234 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

249-14234 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
5972 files on 299 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
167 |  |
 |
 |
 |
 |
 |
 |
|