Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
251-14.jpg
251-14288 viewsNelson Point, BHP's retired Goninan WA's ALCo C636 to GE C36-7M rebuilds, these were the first time in the world that an ALCo C636 had been rebuilt into an GE C36-7, are lined up near the service shop awaiting their fate. The line is 5510, 5506, 5508, 5512, 5513, 5507, 5509, 5511, and, 5513. They had recently been displaced due to the arrival of the AC6000 units which also took their name plates. Only two units would go on to survive 5507 and 5508. 22nd April 2000.
254-22.jpg
254-22288 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
257-16.jpg
257-16288 viewsFlash Butt yard, line up of retired power, the final Comeng NSW built ALCo M636 unit 5499 serial number C6096-4 in Mount Newman Mining livery and then the eight withdrawn Goninan ALCo to GE rebuild C36-7M units 5506, 5510, 5512, 5511, 5513, 5507, 5509 and 5508. Late 2001.
268-23.jpg
268-23288 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
283-14.jpg
283-14288 viewsAt the 45.4 km grade crossing on the Robe River line, loaded train easers around the curve behind the standard quad Goninan CM40-8M units led by 9414 serial number 8206-11 / 91-124 and rebuilt from the final of the original five ALCo units ordered from construction. 22nd of May 2002.
110620_2394r.jpg
110620 2394r288 viewsWalla, loaded BHP ore waggon 3298, one of three hundred and fifty waggons built by Astra Vagoane in Arad Romania in 1988 under a deal with Lang Hancock and waggons for ore arrangement. Only sixty-six entered service. A feature is the fully round 'corners' and side joins, the waggon behind it is a Comeng WA with square features. 20th of June 2011.
050421_1387.jpg
050421 1387287 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
050518_2102.jpg
050518 2102287 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 760.
050518_2141.jpg
050518 2141287 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741, shows bogie detail, ASF Ride Control bogie casting with CFCLA id of CQFE 055.
060429_3760.jpg
060429 3760287 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, view of asset number 6506-017.
110411_10024.jpg
110411 10024287 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
150619_9075.jpg
150619 9075287 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting.
243-25.jpg
243-25287 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
246-27.jpg
246-27287 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
248-04.jpg
248-04287 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
210322_9585.jpg
210322 9585287 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of A end. Location is roughly here. 22nd March 2021.
210510_1109.jpg
210510 1109287 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 011 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1148.jpg
210510 1148287 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 005 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
254-24.jpg
254-24287 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
256-03.jpg
256-03287 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
6096 files on 305 page(s) 169

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional