Most viewed - Pilbara negative and digital Albums - Iron Ore |
![Filename=252-11.jpg
Filesize=325KiB
Dimensions=1280x853
Date added=Nov 27, 2020 252-11.jpg](albums/Pilbara/252/thumb_252-11.jpg)
252-1120 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 01 has been converted from an Nippon Sharyo ore waggon with the fitting of a plough blade, the waggon is also loaded with ballast for ballast. Location is roughly here. 24th November 2001.
|
|
![Filename=252-19.jpg
Filesize=464KiB
Dimensions=1280x853
Date added=Nov 27, 2020 252-19.jpg](albums/Pilbara/252/thumb_252-19.jpg)
252-1920 viewsBetween Pelican and Possum sidings, bridge at the 220.6 km. Location is roughly here.
|
|
![Filename=210510_1104.jpg
Filesize=526KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1104.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1104.jpg)
210510 110420 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=210510_1110.jpg
Filesize=513KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1110.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1110.jpg)
210510 111020 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=210510_1145.jpg
Filesize=597KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1145.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1145.jpg)
210510 114520 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 008 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=254-17.jpg
Filesize=474KiB
Dimensions=1280x853
Date added=Sep 12, 2021 254-17.jpg](albums/Pilbara/254/thumb_254-17.jpg)
254-1720 viewsFlash Butt yard, stored Mt Newman Mining 5499 was the last active ALCo on the BHP roster. Built in November 1975 by Comeng NSW as an ALCo M636 model with serial number C6065-4. Unit was donated to Rail Heritage WA in 2001.
|
|
![Filename=254-20.jpg
Filesize=422KiB
Dimensions=1280x853
Date added=Sep 12, 2021 254-20.jpg](albums/Pilbara/254/thumb_254-20.jpg)
254-2020 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Side view. September 2001.
|
|
![Filename=255-02.jpg
Filesize=630KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-02.jpg](albums/Pilbara/255/thumb_255-02.jpg)
255-0220 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|
![Filename=255-10.jpg
Filesize=419KiB
Dimensions=853x1280
Date added=Sep 12, 2021 255-10.jpg](albums/Pilbara/255/thumb_255-10.jpg)
255-1020 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.
|
|
![Filename=255-12.jpg
Filesize=653KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-12.jpg](albums/Pilbara/255/thumb_255-12.jpg)
255-1220 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
|
|
![Filename=255-15.jpg
Filesize=558KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-15.jpg](albums/Pilbara/255/thumb_255-15.jpg)
255-1520 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
|
|
![Filename=255-24.jpg
Filesize=582KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-24.jpg](albums/Pilbara/255/thumb_255-24.jpg)
255-2420 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, on the right is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.
|
|
![Filename=256-05.jpg
Filesize=697KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-05.jpg](albums/Pilbara/256/thumb_256-05.jpg)
256-0520 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|
![Filename=256-11.jpg
Filesize=521KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-11.jpg](albums/Pilbara/256/thumb_256-11.jpg)
256-1120 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-14.jpg
Filesize=523KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-14.jpg](albums/Pilbara/256/thumb_256-14.jpg)
256-1420 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
|
|
![Filename=256-23.jpg
Filesize=553KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-23.jpg](albums/Pilbara/256/thumb_256-23.jpg)
256-2320 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.
|
|
![Filename=256-29.jpg
Filesize=499KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-29.jpg](albums/Pilbara/256/thumb_256-29.jpg)
256-2920 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|
![Filename=256-37.jpg
Filesize=421KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-37.jpg](albums/Pilbara/256/thumb_256-37.jpg)
256-3720 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
|
|
![Filename=257-13.jpg
Filesize=716KiB
Dimensions=1280x853
Date added=Mar 12, 2022 257-13.jpg](albums/Pilbara/257/thumb_257-13.jpg)
257-1320 viewsFlash Butt yard, Locotrol II remote waggon 661 which is modified from a Magor USA ore waggon in the late 1980s with Locotrol I remote waggon 2626 modified from a Comeng ore waggon in the 1980s. Late 2001.
|
|
![Filename=257-23.jpg
Filesize=718KiB
Dimensions=1280x853
Date added=Mar 12, 2022 257-23.jpg](albums/Pilbara/257/thumb_257-23.jpg)
257-2320 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. Late 2001.
|
|
3610 files on 181 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
174 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|