Most viewed - Pilbara negative and digital Albums - Iron Ore |

110602 8604359 viewsRio Tinto compressor waggon set CB 04, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

243-28359 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

252-24359 viewsAbydos area, known as the China Wall or London Wall.
|
|

254-19359 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Side view. September 2001.
|
|

255-36359 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.
|
|

256-04359 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

257-04359 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5512 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6041-1 and road number 5455 and assigned new serial number 4839-01 / 88-077. It was delivered in Mount Newman Mining orange and was named Hesta. Late 2001.
|
|

257-12359 viewsFlash Butt yard, Locotrol I remote waggon 2065 which is modified from a Comeng ore waggon in the 1980s. Late 2001.
|
|

268-02359 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

268-04359 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

268-10359 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

3298 Astra Vagoane 110620 2394359 viewsWalla, loaded BHP ore waggon 3298, one of three hundred and fifty waggons built by Astra Vagoane in Arad Romania in 1988 under a deal with Lang Hancock and 'waggons for ore arrangement'. Only seventy-five entered service. A feature is the fully round 'corners' and side joins, the waggon behind it is a Comeng WA with square features. June 20, 2011.
|
|

258-06359 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
|
|

284-04359 viewsNarngulu, Geraldton, AHAF type iron ore waggon AHAF 26012 sits in the yard. One of twenty Kinki Sharyo Ltd of Japan built NHA type iron ore waggon for the North Australia line in 1968 that made it to WA under Aurizon for iron ore traffic on the narrow gauge. November 8, 2004.
|
|

250501 0324359 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3197 - GA 3198, the first pair of the second batch and the first painted pink, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0471359 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3453 - GA 3454, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

233-08358 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-25358 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

CHQY 741 050518 2141358 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741, shows bogie detail, ASF Ride Control bogie casting with CFCLA id of CQFE 055.
|
|

6213 Comeng WA 051001 5709358 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, builders plate detail, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
177 |  |
 |
 |
 |
 |
 |
 |
|