283-2621 viewsHarding Siding, Robe River locomotive 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab.
283-27.jpg
283-2721 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead their 202 loaded ore waggons through the passing track at Siding 1 (Harding) following recent extension of the loop and renaming to Harding. The extension is at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
258-16.jpg
258-1621 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
252-18.jpg
252-1820 viewsRosella Siding looking north from the south end. Dampier is 250 km away. Location is roughly here. 24th November 2001.
252-20.jpg
252-2020 viewsNelson Point BHP Iron Ore's General Electric built AC6000 unit 6074 'Kalgan' serial number 51066 is shutdown near the wheel lathe. Early December 2001.
252-24.jpg
252-2420 viewsAbydos area, known as the China Wall or London Wall.
252-34.jpg
252-3420 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train about the cross the Broome Rd at the 19.4 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
253-08.jpg
253-0820 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
253-21.jpg
253-2120 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-29.jpg
253-2920 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 754.
255-05.jpg
255-0520 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.
255-16.jpg
255-1620 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.
255-20.jpg
255-2020 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
257-09.jpg
257-0920 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
257-21.jpg
257-2120 viewsFlash Butt yard, compressor set #5. Modified Magor USA built ore waggons to form the compressor set, used during the unloading process. Late 2001.
257-25.jpg
257-2520 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. The four styles of waggon in use are visible, behind the loco are three Golynx waggons, then a number of Gunderson USA builds, the ribbed type is a Portec USA built and then following are the Tomlinson WA and Scotts of Ipswich built 70 ton waggons. Late 2001.
257-29.jpg
257-2920 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
257-30.jpg
257-3020 viewsGoldsworthy Junction an empty train thunders through the junction behind 6000 horsepower behemoth 6072 'Hesta' serial number 51064 and built by General Electric in Erie USA in 1999 and a new built CM39-8 unit 5632 'Poseidon' by Goninan with serial number 5831-11 / 88-081. Late 2001.
269-04.jpg
269-0420 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
283-28.jpg
283-2820 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead their 202 loaded ore waggons through the passing track at Siding 1 (Harding) following recent extension of the loop and renaming to Harding. The extension is at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
3681 files on 185 page(s) 179

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional