Most viewed - Pilbara negative and digital Albums - Iron Ore |

041014 122920573 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
|
|

196-07571 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
|
|

180615 1411571 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.
|
|

180616 1830571 viewsEmu Siding, an empty train from Cape Lambert powers upgrade away from Emu Siding up the 1.6 percent grade behind triple General Electric ES44DCi units Rio Tinto loco 8112 with serial 59104 a GE Erie built GE model ES44DCi from the 2nd order in Rio Tinto livery and 8162 in the Rio Tinto stripes and 8116 in Rio Tinto silver with a consist of S and C type waggons. 16th June 2018. GeoData.
|
|

181118 0308r571 viewsRedbank, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
|
|

218-10570 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

150505 7942570 viewsFMG Solomon Line, looking east, earth fill abutment embankment for rail line, Jingarri Creek, expanded view from 7940, shows access road. Geodata: -22.0545750 118.7278517 .
|
|

180208 4370569 viewsCape Lambert Yard. Builders decal of brand new GE built ES44ACi unit 9126 serial 64632, built date of October 2017. 8th February 2018.
Roland Depth image.
|
|

190911 4753569 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

190911 4754569 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

150505 7959568 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the train is being assisted in the rear. Geodata: -22.0189283 118.5861050 .
|
|

207-20567 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.
|
|

160128 00567567 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 has had the hood removed showing the GE 7FDL-16 prime mover and GMG187 alternator, the fuel tank indicates that the frame is a Comeng built ALCo M636.
|
|

218-12566 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

180615 1472565 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.
|
|

219-02564 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 wait their next loaded train to push out, the tail of which is visible on the left with the mine stockpile in the background.
|
|

151111 9495564 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|

180616 1791564 viewsAt the 81 km, loaded Bradken China built B series 'master' waggon 20238 with 'slave' waggon 25238, build date April 2013, leading and setup as an instrumented ore waggon, the solar panels are for charging the instrument batteries.
|
|

223-01563 viewsThe HI red dot logo for Hamersley Iron on a sign near Rosella Siding. 21st October 2000.
|
|

151111 9493563 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
18 |  |
 |
 |
 |
 |
 |
 |
|