Most viewed - Pilbara negative and digital Albums - Iron Ore |

255-04354 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.
|
|

269-02354 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

258-37354 viewsNelson Point, Loco Overhaul Shop, Goninan WA rebuild CM40-8M unit 5645 'Sherlock' serial number 8281-11/93-134. Early May 2002.
|
|

250501 0452354 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2071 - GA 2072, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7795354 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2238 side view showing the logo and park brake details. March 14. 2015.
|
|

6010 Scotts of Ipswich Qld 051001 5705353 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #20, 6010, a Scotts of Ipswich Qld built flat waggon on 03-09-1970.
|
|

0704 Difco USA 060501 3872353 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, the last 'long' side dump waggon 704.
|
|

243-26353 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

253-37353 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

255-18353 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
|
|

240701 2750353 viewsPilbara Railways Historical Society, passenger carriage 'Weelumurra' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2138. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

284-06353 viewsNarngulu yard, XE type hopper waggon XE 24477 built by Westrail Midland Workshops in 1976 as part of a batch of forty-one waggons for ilmenite cartage, seen here labelled for zircon traffic. November 8, 2004.
|
|

284-31353 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

250501 0357353 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2409 - GA 2410, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

251-20352 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 and yet to be named idles away outside the shop. 22nd April 2000.
|
|

210510 1099352 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 021 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1104352 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

255-02352 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|

256-05352 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

257-13352 viewsFlash Butt yard, Locotrol II remote waggon 661 which is modified from a Magor USA ore waggon in the late 1980s with Locotrol I remote waggon 2626 modified from a Comeng ore waggon in the 1980s. Late 2001.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
181 |  |
 |
 |
 |
 |
 |
 |
|