Most viewed - Pilbara negative and digital Albums - Iron Ore |

150314 7764348 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 end view showing where the bar coupling will go and the pipe and electrical connection for the married pair. March 14. 2015.
|
|

233-24347 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

210322 9575347 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 091 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210510 1137347 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

284-30347 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

235-33346 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo, cab side and Alco Hi-Ad bogie.
|
|

210510 1097346 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km the Rio Tinto's Gemco Rail built rail train consist rounds the curve as it heads to the 84 km. 10th May 2021. Location.
|
|

210510 1100346 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

256-22346 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train into the passing track. 9417 was the first CM40-8M rebuild carried out by Goninan in 1989, it was originally an ALCo built C636 unit for Spokane Portland & Seattle numbered 340 with serial number 6010-1, it went onto to be Burlington Northern 4366 and then purchased for Robe River in late 1980 as a parts source. When finally rebuilt by Goninan in June 1989 it had new serial number of 6266-5 / 89-83 and replaced the original 9417 which was scrapped in 1979. May 2002.
|
|

256-23346 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.
|
|

257-29346 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
|
|

258-07346 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
|
|

250501 0418346 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2745 - GA 2746, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

233-26345 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
|
|

100329 8041345 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

253-28345 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggons, coupling of CHRY 755 and CHRY 757.
|
|

284-36345 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
|
|

250501 0531345 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3433 - GA 3434, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|

250501 0540345 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2743 - GA 2744, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

210510 1145344 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 008 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
184 |  |
 |
 |
 |
 |
 |
 |
|