Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
283-15.jpg
283-15344 viewsAt the 45.4 km grade crossing on the Robe River line, loaded train easers around the curve behind the standard quad Goninan CM40-8M units led by 9414 serial number 8206-11 / 91-124 and rebuilt from the final of the original five ALCo units ordered from construction. 22nd of May 2002.
258-23.jpg
258-23344 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
258-25.jpg
258-25344 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
258-32.jpg
258-32344 viewsNelson Point, Wheel Lathe shop with Ore Car Repair Shop and Yard Control behind it. General Electric built AC6000 locomotive 6074 'Kalgan' is out the front. Early May 2002.
240701_2735.jpg
240701 2735344 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. July 1, 2024.
284-29.jpg
284-29344 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
250501_0337.jpg
250501 0337344 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3051 - GA 3052, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0356.jpg
250501 0356344 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3149 - GA 3150, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0401.jpg
250501 0401344 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3001 - GA 3002, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
233-34.jpg
233-34343 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
235-31.jpg
235-31343 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo, cab side and Alco Hi-Ad bogie.
249-14.jpg
249-14343 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
253-23.jpg
253-23343 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
283-11.jpg
283-11343 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
258-16.jpg
258-16343 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
284-34.jpg
284-34343 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
254-16.jpg
254-16342 viewsFlash Butt yard, stored line-up of the eight Goninan ALCo to GE rebuild C36-7M units, 5506 with serial number 4839-01 / 87-071. This was the first unit in the world to be built into a C36-7 from an ALCo C636 locomotive. It was rebuilt 1987 from AE-Goodwin built ALCo C636 numbered 5455 with serial number G6012-4.
255-10.jpg
255-10342 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.
255-15.jpg
255-15342 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
256-02.jpg
256-02342 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
6217 files on 311 page(s) 185

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional