|  Most viewed - Pilbara negative and digital Albums - Iron Ore | 
        
        | 
                        
                                |  284-31259 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
 |  | 
                        
                                |  250501 0322259 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2935 - GA 2936, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
 |  | 
                        
                                |  256-31258 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
 |  | 
                        
                                |  257-12257 viewsFlash Butt yard, Locotrol I remote waggon 2065 which is modified from a Comeng ore waggon in the 1980s. Late 2001.
 |  | 
        
        | 
                        
                                |  258-05257 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
 |  | 
                        
                                |  258-07257 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
 |  | 
                        
                                |  258-09257 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-01 / 88-077 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
 |  | 
                        
                                |  250501 0306257 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2985 - GA 2986, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
 |  | 
        
        | 
                        
                                |  210322 9571256 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 079 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
 |  | 
                        
                                |  210510 1149256 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 004 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
 |  | 
                        
                                |  253-28256 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggons, coupling of CHRY 755 and CHRY 757.
 |  | 
                        
                                |  258-33256 viewsNelson Point, Wheel Lathe shop with Ore Car Repair Shop and Yard Control behind it. General Electric built AC6000 locomotive 6074 'Kalgan' is out the front. Early May 2002.
 |  | 
        
        | 
                        
                                |  258-34256 viewsNelson Point, Loco Overhaul Shop, Goninan WA rebuild CM40-8M unit 5645 'Sherlock' serial number 8281-11/93-134. Early May 2002.
 |  | 
                        
                                |  284-32256 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
 |  | 
                        
                                |  250501 0550256 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2835 - GA 2836, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
 |  | 
                        
                                |  210321 9038256 viewsBoodarie, part of a loaded FMG train, painted ore waggon pair 7687 - 8688 built by CRRC Yangtze Rolling Stock Co. of China in 2018, 7687 waggon view, it features mural painting by students of South Hedland High School and was painted in August 2018. March 21, 2021.
 |  | 
        
        | 
                        
                                |  256-18255 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
 |  | 
                        
                                |  257-29255 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
 |  | 
                        
                                |  269-04255 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
 |  | 
                        
                                |  210510 1106254 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 014 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
 |  | 
        
                | 
                                
                                       | 6096 files on 305 page(s) |  |  |  |  |  |  |  |  | 185 |  |  |  |  |  |  |  |  |