Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
160128_00567.jpg
160128 00567587 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 has had the hood removed showing the GE 7FDL-16 prime mover and GMG187 alternator, the fuel tank indicates that the frame is a Comeng built ALCo M636.
180615_1472.jpg
180615 1472587 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.
219-08.jpg
219-08586 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7090 serial 47769 view of radiator and rear bogie, coupled to 7089. In the original 'Pepsi Can' livery as delivered.
16947.jpg
16947586 viewsBassendean, an overview of the rear of Goninan's workshops, Westrail P class and Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
207-04.jpg
207-04585 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
219-17.jpg
219-17584 viewsMunjina Gorge, looking east from vantage point.
150505_7988.jpg
150505 7988584 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
1048_001.jpg
1048 001584 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
041014_141930.jpg
041014 141930584 viewsPilbara Railways Historical Society, view along the passenger carriages, closest is the 'Conference Car' with SV 4 still visible, originally built by Clyde Engineering at Granville NSW in 1935 for the NSWGR as a second class railway carriage FS type FS 2010. In 1975 it was purchased by Hamersley Iron and converted to an inspection vehicle SV 4. When donated to the Society it was repurposed as a conference car. 14th October 2004.
207-11.jpg
207-11583 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
219-09.jpg
219-09583 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 idles away waiting the next loaded train to push out.
1049_001.jpg
1049 001583 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining with sister unit 5632 inline behind it.
Jim Bisdee photo.
269-17.jpg
269-17583 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
207-00.jpg
207-00582 viewsKoodaideri (spelt wrong) turnoff sign on the Wittenoom - Roy Hill Rd. Geo location.
151111_9493.jpg
151111 9493582 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
160128_00882.jpg
160128 00882582 viewsWedgefield, Sims Metal Yard, view looking at the inside of the cab front wall and the ALCo Hi-Ad bogie shows the external coil secondary suspension.
16944.jpg
16944581 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back with the shunt loco for company and ALCo 251 engine is in the foreground.
Jim Bisdee photo.
040412_143234.jpg
4384 Goninan 040412 143234581 viewsNelson Point, a Goninan built ore waggon 4384, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 12th April 2004.
267-23.jpg
267-23581 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
207-09.jpg
207-09580 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, the size of the extended radiator compared to domestic AC6000 units is evident here.
6220 files on 311 page(s) 19

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional