Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
203-06.jpg
203-06188 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.
203-08.jpg
203-08188 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
203-12.jpg
203-12188 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.
218-13.jpg
218-13188 viewsDe Grey River, a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine.
151111_9493.jpg
151111 9493188 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
151111_9501.jpg
151111 9501188 viewsAt the 47 km post on the Cape Lambert line a loaded train runs along on the West Mainline behind 7050 and 7057 both General Electric Dash 9-44CW units with serials of 57101 and 55882 and the last General Electric ES44DCi 8199, serial 61858.
041014_122804.jpg
041014 122804188 viewsPilbara Railways Historical Society, Mancha battery hauler from the former CSR underground blue asbestos mine at Wittenoom, driving position is at the rear in this shot. Shows misspelling on the side of EXPRSS rather than express. Donated to the Society in 2003. 14th October 2004.
250-27.jpg
250-27188 viewsCape Lambert yard on the Load Box Spur is recently stored Robe River AE Goodwin built ALCo M636 unit 9413 serial G6060-4 from December 1971, originally numbered 262.004 during construction, renumbered to 86-14-1713 with number boards 1713 and finally 9413. The ducting on the hood is the air to air intercooler modifications. 22nd October 2000.
250-36.jpg
250-36188 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. 22nd October 2000.
207-03.jpg
207-03187 viewsYandi One balloon loop, Comeng WA built ore waggon 1442 coupled to a Goninan style waggon 4146 on the empty side of the load-out tunnel, August 1999.
180615_1472.jpg
180615 1472187 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.
040412_143710.jpg
040412 143710187 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 2940 are known as Golynx waggons, one of 345 such waggons constructed during 2001 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. 12th April 2004.
197-07.jpg
197-07186 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
151111_9485.jpg
151111 9485186 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
150505_8003.jpg
150505 8003186 viewsFMG Solomon Line, Bowaling Claypan, located just off the Wittenoom - Roebourne Road. Geodata: -22.0843050 118.3361267 .
040412_144321.jpg
040412 144321186 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon known as Golynx waggons, one of 345 such waggons constructed during 2001 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. 12th April 2004.
041014_142048.jpg
041014 142048186 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
218-10.jpg
218-10185 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
218-14.jpg
218-14185 viewsDe Grey River, a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine. Then the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
040801_144038.jpg
040801 144038185 viewsWalla Siding, Goninan built, Lynx Engineering designed ore waggon 4403 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 203510 with serial 950124-004 and build date 02/2004. 1st August 2004.
3621 files on 182 page(s) 19

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional