Most viewed - Pilbara negative and digital Albums - Iron Ore |

207-09321 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, the size of the extended radiator compared to domestic AC6000 units is evident here.
|
|

218-10321 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

210321 9304321 viewsBoodarie on the 5 km curve loaded FMG master ore waggon 6746 was built by CSR Yangtze with a prototype pressed lower panels and is joined to 5745. This pair is the same as 3005 - 4006. 21st March 2021.
|
|

203-13320 viewsBing Siding, a loaded BHP Iron Ore train with a pair of CM40-8M units on the lead are on the mainline as the cross the empty train behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068.
|
|

207-03320 viewsYandi One balloon loop, Comeng WA built ore waggon 1442 coupled to a Goninan style waggon 4146 on the empty side of the load-out tunnel, August 1999.
|
|

223-36320 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
|
|

150505 7943320 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side. Geodata: -22.0525633 118.7199633 .
|
|

150505 8003320 viewsFMG Solomon Line, Bowaling Claypan, located just off the Wittenoom - Roebourne Road. Geodata: -22.0843050 118.3361267 .
|
|

196-12319 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

196-13319 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

196-15319 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C #5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
|
|

223-01319 viewsThe HI red dot logo for Hamersley Iron on a sign near Rosella Siding. 21st October 2000.
|
|

203-01318 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.
|
|

203-09318 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.
|
|

207-04318 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

219-12318 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from the Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 view of the lettering and fuel tank left hand side.
|
|

180615 1472318 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.
|
|

190911 4755318 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

041014 142110318 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
|
|

3080 roster lhs 041218 181459318 viewsNelson Point, BHP Billiton yard pilot EMD SD40 unit 3080 serial number 33674 / 7083-4 originally Southern Pacific unit SP 8482 and still wearing former owner IC&E blue and yellow livery seen here off the wheel lathe. 18th of December 2004.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
19 |  |
 |
 |
 |
 |
 |
 |
|