Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
258-33.jpg
258-33289 viewsNelson Point, Wheel Lathe shop with Ore Car Repair Shop and Yard Control behind it. General Electric built AC6000 locomotive 6074 'Kalgan' is out the front. Early May 2002.
284-28.jpg
284-28289 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
250501_0377.jpg
250501 0377289 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3205 - GA 3206, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0508.jpg
250501 0508289 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2239 - GA 2240, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0550.jpg
250501 0550289 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2835 - GA 2836, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0555.jpg
250501 0555289 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2431 - GA 2432, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0624.jpg
250501 0624289 viewsThomas Yard, one of FMG's thirty five ballast waggons, BH 05, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. May 1, 2025.
256-14.jpg
256-14288 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
256-28.jpg
256-28288 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
258-17.jpg
258-17288 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
250501_0366.jpg
250501 0366288 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2869 - GA 2870, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0436.jpg
250501 0436288 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2189 - GA 2190, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
258-11.jpg
258-11287 viewsNelson Point, Goninan GE rebuild C36-7M unit 5513 serial 4839-02 / 88-078 is in the process of being removed from site bound for Goninan, Bassendean, Perth. May 2002.
250501_0311.jpg
250501 0311287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2025 - GA 2026, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0316.jpg
250501 0316287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2775 - GA 2776, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0332.jpg
250501 0332287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2845 - GA 2846, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0340.jpg
250501 0340287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2227 - GA 2228, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0382.jpg
250501 0382287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3161 - GA 3162, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0543.jpg
250501 0543287 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2597 - GA 2598, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0621.jpg
250501 0621287 viewsThomas Yard, the second of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010. May 1, 2025.
6096 files on 305 page(s) 190

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional