Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0351.jpg
250501 0351281 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2411 - GA 2412, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0406.jpg
250501 0406281 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2269 - GA 2270, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0461.jpg
250501 0461281 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2377 - GA 2378, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0470.jpg
250501 0470281 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3437 - GA 3438, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0533.jpg
250501 0533281 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2069 - GA 2070, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250430_10060.jpg
250430 10060281 viewsBoodarie, a totally mismatched FMG waggon pair, 1599 [slave] is an original CSR Zhuzhou build from 2007, and the renumbered 2600 [master] is an CRRC Yangtze build, second style, which only started appearing from 2014 and was originally 8366. Loaded train May 1, 2025.
250501_0620.jpg
250501 0620281 viewsThomas yard, the first of two FMG ballast plough waggons BP 01, built in China by CSR at the Yangtze Rolling Stock Company in 2010. May 1, 2025.
081225_0573.jpg
081225 0573281 viewsBarker Siding, view of two of FMG's ballast waggons F type couplings, electric and air connections. 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
253-05.jpg
253-05280 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW unit 7078, from the original order with serial number 47757 roll past an empty train on the passing track with second unit 7076.
250501_0344.jpg
250501 0344280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3383 - GA 3384, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0374.jpg
250501 0374280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3539 - GA 3540, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0395.jpg
250501 0395280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3247 - GA 3248, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0462.jpg
250501 0462280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2647 - GA 2648, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0539.jpg
250501 0539280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3387 - GA 3388, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0540.jpg
250501 0540280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2743 - GA 2744, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0548.jpg
250501 0548280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2033 - GA 2034, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0549.jpg
250501 0549280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2497 - GA 2498, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210510_1143.jpg
210510 1143279 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
250501_0339.jpg
250501 0339279 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2791 - GA 2792, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0466.jpg
250501 0466279 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3493 - GA 3494, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
6096 files on 305 page(s) 193

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional