Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
081225_0571.jpg
BH 11 081225 0571312 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 11, non-handbrake end piping view, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
250501_0358.jpg
250501 0358311 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2285 - GA 2286, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0506.jpg
250501 0506311 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3115 - GA 3116, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210321_9036.jpg
07687-08688 210321 9036311 viewsBoodarie, part of a loaded FMG train, painted ore waggon pair 7687 - 8688 built by CRRC Yangtze Rolling Stock Co. of China in 2018, it features mural painting by students of South Hedland High School and was painted in August 2018. March 21, 2021.
284-15.jpg
284-15310 viewsNarngulu, Geraldton, former Westrail P class loco P 2014 'Shire of Wongan-Ballidu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard on empty grain waggons with sister loco P 2003. November 9, 2004.
250501_0369.jpg
250501 0369310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3593 - GA 3594, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0412.jpg
250501 0412310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2669 - GA 2670, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0498.jpg
250501 0498310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3563 - GA 3564, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0500.jpg
250501 0500310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2925 - GA 2926, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0525.jpg
250501 0525310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3531 - GA 3532, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0528.jpg
250501 0528310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2173 - GA 2174, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210510_1147.jpg
210510 1147309 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 006 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
250501_0355.jpg
250501 0355309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2945 - GA 2946, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0463.jpg
250501 0463309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3537 - GA 3538, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0466.jpg
250501 0466309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3493 - GA 3494, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0484.jpg
250501 0484309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3355 - GA 3356, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0533.jpg
250501 0533309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2069 - GA 2070, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7789.jpg
150314 7789309 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2144 end view showing the F type coupler, hose and electrical connection and uncoupling lever, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
250501_0623.jpg
BH 13 250501 0623309 viewsThomas Yard, one of FMG's thirty five ballast waggons, BH 13, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. May 1, 2025.
250501_0313.jpg
250501 0313308 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2505 - GA 2506, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
6217 files on 311 page(s) 197

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional