Most viewed - Pilbara negative and digital Albums - Iron Ore |

081225 0560160 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 01, side profile view, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
|
|

250501 0368159 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2341 - GA 2342, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0461159 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2377 - GA 2378, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0470159 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3437 - GA 3438, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0510159 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2251 - GA 2252, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0515159 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3223 - GA 3224, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|

080620 2648159 viewsBoodarie, FMG's lowest numbered waggon pair, 1001 [slave] - 2002 [master], on a loaded arriving at the port around the 5 km curve. This was the second set numbered 1001 - 2002, as the original all flat sided pair went on to become a compressor set. Built by CSR Zhuzhou, China in 2007. June 20, 2008.
|
|

250501 0323158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3073 - GA 3074, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0333158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2273 - GA 2274, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0335158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2501 - GA 2502, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0442158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3337 - GA 3338, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0446158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3629 - GA 3630, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0486158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2757 - GA 2558, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0533158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2069 - GA 2070, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7789158 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2144 end view showing the F type coupler, hose and electrical connection and uncoupling lever, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
|
|

250501 0360157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2601 - GA 2602, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0383157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2919 - GA 2920, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0410157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2349 - GA 2350, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0444157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2063 - GA 2064, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0462157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2647 - GA 2648, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
200 |  |
 |
 |
 |
 |
 |
 |
|