Most viewed - Pilbara negative and digital Albums - Iron Ore |

151111 9485511 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|

160128 00882511 viewsWedgefield, Sims Metal Yard, view looking at the inside of the cab front wall and the ALCo Hi-Ad bogie shows the external coil secondary suspension.
|
|

239-24511 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotive 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 edging towards the load-out tunnel on the 17/01/1997. GeoData.
|
|

040408 170024511 viewsBing Siding, Difco Ohio USA 1966 built short side dump waggon 4 loaded with rip-rap, originally built for Goldsworthy Mining as no. 4, one five such waggons built for Goldsworthy Mining.
|
|

196-12510 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

203-07510 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

219-07510 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7090 serial 47769 in the delivered 'Pepsi Can' livery. Drivers side cab view.
|
|

151111 9491510 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|

151111 9489510 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 on the Cape Lambert line.
|
|

170726 9424510 viewsRedbank on the edge of Nelson Point, a loaded BHP iron ore train from Yandi arrives on the west mainline behind Electro Motive built SD70ACe unit 4331 'Withnell' serial 20066862-060 leading an SD70ACe/LC with another two SD70ACe/LC units in the middle of the 264 waggon consist. 26th July 2017.
|
|

041014 142636510 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built in July 1976, retired in 1994, donated to the Society in November 1995. 14th October 2004.
|
|

246-31510 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 700 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

040412 143726509 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 4973 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 2032597 with build date 02/2004. 12th April 2004.
|
|

196-02508 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

219-17508 viewsMunjina Gorge, looking east from vantage point.
|
|

223-24508 viewsPossum Siding, Hamersley Iron locos built by General Electric model Dash 9-44CW units 7072 serial 47751 with 210 waggons loaded ex Marandoo changes crew with sister loco 7082 serial 47761 on an empty at 1500 hrs 21st October 2000.
|
|

151111 9512508 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
|
|

040412 143234508 viewsNelson Point, a Goninan built ore waggon 4384, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 12th April 2004.
|
|

207-02507 viewsKoodaideri, view from saddleback looking north across the Fortescue Valley, Wittenoom - Roy Hill Rd can be seen if you know what to look for.
|
|

207-05507 viewsYandi One balloon loop, Goninan built ore waggon 4146 coupled to an original style Comeng waggon on the empty side of the load-out tunnel, August 1999.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
21 |  |
 |
 |
 |
 |
 |
 |
|