Most viewed - Pilbara negative and digital Albums - Iron Ore |

269-23524 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

207-02523 viewsKoodaideri, view from saddleback looking north across the Fortescue Valley, Wittenoom - Roy Hill Rd can be seen if you know what to look for.
|
|

207-06523 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

207-10523 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of inverter, fuel tank and engine hood.
|
|

207-21523 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.
|
|

219-10523 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 left hand side radiator and bogie view.
|
|

240-26523 viewsSeven Mile, loaded train heading for Parker Point behind a pair of Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW units 9470 serial 53455 and 9471 serial 53456. These and sister unit 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
|
|

196-13522 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

219-11522 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 left hand side cab and bogie view.
|
|

160128 00882522 viewsWedgefield, Sims Metal Yard, view looking at the inside of the cab front wall and the ALCo Hi-Ad bogie shows the external coil secondary suspension.
|
|

041014 142636522 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built in July 1976, retired in 1994, donated to the Society in November 1995. 14th October 2004.
|
|

196-12521 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

203-07521 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

219-13521 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 idle away waiting their next loaded train to push out, the mine is visible in the background.
|
|

16953521 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible. October 1993.
Jim Bisdee photo.
|
|

240-27521 viewsSeven Mile, loaded train heading for Parker Point behind a pair of Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW units 9470 serial 53455 and 9471 serial 53456. These and sister unit 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
|
|

180614 1331521 viewsAllen Siding, the points and what remains of the point machine at the 45 km for the siding, looking east. GeoData. 14th June 2018.
|
|

246-31521 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 700 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

203-02520 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.
|
|

151111 9491520 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
21 |  |
 |
 |
 |
 |
 |
 |
|