Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
160128_00429.jpg
160128 00429537 viewsWedgefield, Sims Metal Yard, the sparks fly as the remains on an ALCo frame are thermal lanced into smaller manageable pieces, a GE V16 7FDL-16 engine is also cut in half.
190911_4755.jpg
190911 4755537 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
196-13.jpg
196-13536 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
151111_9489.jpg
151111 9489536 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 on the Cape Lambert line.
040412_144307.jpg
040412 144307536 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, view of handbrake end. 12th April 2004.
203-07.jpg
203-07535 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
203-09.jpg
203-09535 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.
150505_7988.jpg
150505 7988535 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
269-23.jpg
269-23535 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
196-12.jpg
196-12534 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
207-10.jpg
207-10534 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of inverter, fuel tank and engine hood.
207-21.jpg
207-21534 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.
240-26.jpg
240-26534 viewsSeven Mile, loaded train heading for Parker Point behind a pair of Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW units 9470 serial 53455 and 9471 serial 53456. These and sister unit 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
219-11.jpg
219-11533 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 left hand side cab and bogie view.
200914_iPhone_IMG_8836.jpg
200914 iPhone IMG 8836533 viewsPilbara Railways Historical Society, observer's position view of Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
246-31.jpg
246-31533 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 700 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
207-06.jpg
207-06532 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
219-13.jpg
219-13532 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 idle away waiting their next loaded train to push out, the mine is visible in the background.
239-26.jpg
239-26532 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotives 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 with a LocoTrol equipped Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. GeoData.
16953.jpg
16953532 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible. October 1993.
Jim Bisdee photo.
6096 files on 305 page(s) 21

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional