Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
196-13.jpg
196-13329 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
203-09.jpg
203-09329 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.
219-06.jpg
219-06329 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
040412_143652.jpg
040412 143652329 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 4973 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 2032597 with build date 02/2004. 12th April 2004.
200914_iPhone_IMG_8836.jpg
200914 iPhone IMG 8836329 viewsPilbara Railways Historical Society, observer's position view of Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
196-15.jpg
196-15328 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C #5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
203-01.jpg
203-01328 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.
040412_143234.jpg
040412 143234328 viewsNelson Point, a Goninan built ore waggon 4384, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 12th April 2004.
246-31.jpg
246-31328 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 700 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
151111_9501.jpg
151111 9501327 viewsAt the 47 km post on the Cape Lambert line a loaded train runs along on the West Mainline behind 7050 and 7057 both General Electric Dash 9-44CW units with serials of 57101 and 55882 and the last General Electric ES44DCi 8199, serial 61858.
150523_8274.jpg
150523 8274327 viewsFinucane Island, loaded train arriving at the Island behind Progress Rail SD70ACe unit 4434 'Koombana' serial 20128866-003 and same batch sibling 4435 serial 20128866-004 train is running under new Roy Hill conveyor and road bridge. Geodata: -20.3363383 118.5497850 .
6998_001.jpg
6998 001327 viewsWelshpool, Goninan workshops, a newly build frame for a Mt Newman Mining GE model CM39-8 sits upside down on shop bogies. Late 1998.
Jim Bisdee photo.
3079_roster_rhs_040627_134646.jpg
3079 roster rhs 040627 134646327 viewsNelson Point BHP Billiton SD40 unit 3079 serial 31542 originally Southern Pacific SD40 SP 8461 and still in former owner IC&E blue and yellow has been fitted with some crew amenities like cab air-con, radios and microwave to allow it to operate as a yard pilot, seen here in the yard on the 27th of June 2004.
040412_144554.jpg
040412 144554326 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 4912 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, part of Rake 3 of 120 waggon, build date 01/2004. 12th April 2004.
041225_064755.jpg
041225 064755326 viewsNelson Point Ore Car Repair Shop, original Magor USA built ore waggon 581, known as the 'Oro's', one of 144 built in 1963 and bought by the Mt Newman partners in 1968 from the Oroville Dam construction in California. 25th December 2004.
151111_9506.jpg
151111 9506325 viewsA view from Table Hill looking south west across the Robe River rail line and the rolling hills and mesas.
170726_9434.jpg
170726 9434325 viewsKanyirri yard, a short FMG shunt train departs the yard and heads to the car dumper balloons behind Progress Rail built SD70ACe/LCi unit 702 serial 20118611-002 and ten pairs of ore waggons. 26th July 2017.
180615_1496.jpg
180615 1496325 viewsMooka Yard, side view of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
200914_7777.jpg
200914 7777325 viewsPilbara Railways Historical Society, PWT 1 the water gin waggon used with the steam locomotive Pendennis Castle, this waggon had a proportional valve fitted to control the Westinghouse brake system on the train via the vacuum brake on the Pendennis Castle and former Cliffs Robe River ALCo RSC3 locomotive 4002. 14th September 2020.
196-14.jpg
196-14324 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
4019 files on 201 page(s) 22

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional