Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
0789_210322_9795.jpg
0789 210322 9795125 viewsRobe River ore waggon 789, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0817_180616_1678.jpg
0817 180616 1678125 viewsRobe River ore waggon 817, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view with the pulled fixed coupler from 425 and its fixed coupler end at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
0823_180616_1852.jpg
0823 180616 1852125 viewsRobe River ore waggon 823, built by Centurion Industries WA, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
240619_0367.jpg
240619 0367125 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31549 is a master and is bar coupled to slave waggon 36549 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0373.jpg
240619 0373125 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31463 is a master and is bar coupled to slave waggon 36463 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0434.jpg
240619 0434125 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31453 is a master and is bar coupled to slave waggon 36453 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240701_2382.jpg
240701 2382125 viewsWestern Creek, 67 km, Rio Tinto's GE built ES44DCi locomotive 9141 with serial number 64731, delivered in 2018 from the sixth order of this model from GE. Captured on July 1, 2024.
240701_2404.jpg
240701 2404125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31585 is a master and is bar coupled to slave waggon 36585 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2432.jpg
240701 2432125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31596 is a master and is bar coupled to slave waggon 36596 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2438.jpg
240701 2438125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31633 is a master and is bar coupled to slave waggon 36633 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2454.jpg
240701 2454125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31665 is a master and is bar coupled to slave waggon 36665 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2472.jpg
240701 2472125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31649 is a master and is bar coupled to slave waggon 36649 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2479.jpg
240701 2479125 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31577 is a master and is bar coupled to slave waggon 36577 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
0001_160306_1260.jpg
0001 160306 1260124 viewsRobe River ore waggon 001, built by Nippon Sharyo Nihon, fixed coupler end non-handbrake side empty view, from above. Greenpool Siding area, March 6, 2016.
0003_170728_09952.jpg
0003 170728 09952124 viewsRobe River ore waggon 003, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0022_170729_0266.jpg
0022 170729 0266124 viewsRobe River ore waggon 022, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0106_081209_0127.jpg
0106 081209 0127124 viewsRobe River ore waggon 106, built by Nippon Sharyo Nihon, rotary coupler end and plate detail loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0116_160306_1543.jpg
0116 160306 1543124 viewsRobe River ore waggon 116, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0158_160306_1470.jpg
0158 160306 1470124 viewsRobe River ore waggon 158, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0166_141124_6823.jpg
0166 141124 6823124 viewsRobe River ore waggon 166, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
6096 files on 305 page(s) 267

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional