Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
040407_073240.jpg
040407 073240352 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172, 7th April 2004.
040407_075058.jpg
040407 075058352 viewsMooka Siding, Mooka North location relay room with solar panel array on the north side, arrival LED type signal MAN 3 visible beside the mainline. 7th April 2004.
040412_143532.jpg
040412 143532352 viewsNelson Point, Comeng WA built ore waggon 1760 one of 288 waggons built in 1974. 12th April 2004.
200914_7811.jpg
200914 7811352 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th September 2020.
041014_142329.jpg
041014 142329352 viewsPilbara Railways Historical Society, view along the passenger carriages behind rebuilt ALCo C636R locomotive 3017 with the first passenger carriage 'Bellary' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2143. In 1987 it was purchased by the Society and is named after a local river. The next carriage is van 'Portland' and originally an NSWGR MHO type guards van MHO 2321, then recoded to KB type mail van, then to KBY 2513 guards van. For a view 20 years later click here. 14th October 2004.
250-04.jpg
250-04352 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
197-07.jpg
197-07351 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
203-18.jpg
203-18351 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.
170726_9447.jpg
170726 9447351 viewsFinucane Island, running around the balloon loop with an empty BHP iron ore train behind Progress Rail Muncie USA built SD70ACe/LCi unit 4413 serial 20118685-011 with a sister unit as they head back to be provisioned at Boodarie. 26th July 2017.
170726_9457.jpg
170726 9457351 viewsBoodarie, FMG ore waggon pair 2800 (control) and 1799 (slave) of the original design and loaded with fines ore shows evidence of side wall panel replacement and new relining dates. 26th July 2017.
151206_9653.jpg
151206 9653351 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, behind a Gavin Transport Mack Titan 600 on a Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
203-17.jpg
203-17350 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.
218-20.jpg
218-20350 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km with a loaded train on approach.
080621_2722.jpg
080621 2722350 viewsTabba South, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
170727_9643.jpg
170727 9643350 viewsWoodstock Siding, a Roy Hill ballast train works north with rear end locomotive General Electric Erie built model ES44ACi unit RHA 1020 serial 64301 trailing the ballast plough. 27th July 2017. GeoData.
060723_7841.jpg
060723 7841350 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
180616_1679.jpg
180616 1679350 viewsCooya Pooya, instrumented ore waggon 1031, part of a second batch of extra 'J' waggons built by Bradken in September 2008 and painted rather than the plain steel finish. Solar panels adorn the waggon sides. 16th June 2018. GeoData.
150619_9157.jpg
150619 9157350 viewsWalla back track, BHP track machines BR 33 and Tamper 3 both Plasser Australia units, BR33 is a ballast regulator model SSP302 serial M486 while Tamper 3 is a model 09-3X serial M480. 19th June 2015.
130720_1557.jpg
130720 1557349 viewsFlash Butt yard, out of service crib waggon a cut down Magor USA built Oroville ore waggon, seen here with a new Ausco donga replacing the original ATCO unit.
170726_9461.jpg
170726 9461349 viewsBoodarie, a loaded FMG iron ore train round the large curve at the 5 km as the train is passing under the Great Northern Highway behind Progress Rail Muncie USA built SD70ACe/LCi unit 717 serial 20118693-009 and sister 718 as they head for the car dumper unloading balloon loops. 26th July 2017.
5625 files on 282 page(s) 29

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional