Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
242-18.jpg
242-18128 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
180616_1679.jpg
180616 1679128 viewsCooya Pooya, instrumented ore waggon 1031, part of a second batch of extra 'J' waggons built by Bradken in September 2008 and painted rather than the plain steel finish. Solar panels adorn the waggon sides. 16th June 2018. GeoData.
200914_7758.jpg
200914 7758128 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
041014_142544.jpg
041014 142544128 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSD-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th October 2004.
207-27.jpg
207-27127 viewsHardie Siding, BHP unit 5669 'Builen' serial 8412-02 / 95-160 is the highest numbered CM40-8MEFI rebuild by Goninan in the BHP roster, leading an empty train as it takes the passing track to effect a cross.
221-08.jpg
221-08127 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
040419_102228.jpg
040419 102228127 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, 3/4 view from non-handbrake end, shows access ladder profiles, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
040616_162154.jpg
040616 162154127 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
060714_6813.jpg
060714 6813127 viewsHesta Siding, view from the rear of the rail recovery and transport train as it snakes around the curves. Crib waggon 665 a former Magor USA built ore waggon, heavily modified by Mt Newman Mining workshops and fitted with an ATCO donga.
170726_9429.jpg
170726 9429127 viewsRedbank, a loaded BHP iron ore train from Yandi arrives past the arrival signals for Nelson Point yard on the west mainline behind Electro Motive built SD70ACe unit 4331 'Withnell' serial 20066862-060 leading an SD70ACe/LC with another two SD70ACe/LC units in the middle of the 264 waggon consist. 26th July 2017.
20846.jpg
20846127 viewsBassendean, Goninan workshops, newly completed BHP Iron Ore CM40-8M rebuild unit 5637 'De Grey' serial 8181-01 / 92-123 sits on a Bell road transport float bound for Port Hedland. 5637 was rebuilt from AE Goodwin ALCo C636 unit 5456 serial G6012-5. January 1992 image.
Jim Bisdee photo.
22473.jpg
22473127 viewsBassendean, Goninan workshops, Robe River's Comeng NSW built ALCo model M636 9422 serial C6103-2 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in March 1993. Image September 1992.
Jim Bisdee photo.
22648.jpg
22648127 viewsBassendean, Goninan workshops, brand new GE CM40-8M rebuild unit for BHP Iron Ore 5634 'Boodarie' serial 8151-07 / 91-120 looks to be in the final stages of construction as it sits out side with Westrail P class GE model CM25-8 unit P 2015 serial 6320-01 / 91-100 and a Robe River ALCo in the background during an Open Day on 20th July 1991.
Jim Bisdee photo.
040413_165913.jpg
040413 165913127 viewsNelson Point, ore waggon bogie, Bradken cast SSRC bogie which stands for Super Service Ride Control.
150619_9157.jpg
150619 9157127 viewsWalla back track, BHP track machines BR 33 and Tamper 3 both Plasser Australia units, BR33 is a ballast regulator model SSP302 serial M486 while Tamper 3 is a model 09-3X serial M480. 19th June 2015.
151206_9652.jpg
151206 9652127 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, on a Gavin Transport Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
200914_7755.jpg
200914 7755127 viewsPilbara Railways Historical Society museum, 5450 a USA built EMD model F7A serial 8970 and frame 3006-A9, built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. Donated to the Society in 1978. 14th September 2020.
220-01.jpg
220-01126 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east from the 135 km post.
170726_9430.jpg
170726 9430126 viewsRedbank, a loaded BHP iron ore train from Yandi arrives into Nelson Point yard on the west mainline with mid-train remote units built by Progress Rail as SD70ACe unit 4377 serial 20108424-004 leading an SD70ACe/LC unit 4345. 26th July 2017.
170726_9461.jpg
170726 9461126 viewsBoodarie, a loaded FMG iron ore train round the large curve at the 5 km as the train is passing under the Great Northern Highway behind Progress Rail Muncie USA built SD70ACe/LCi unit 717 serial 20118693-009 and sister 718 as they head for the car dumper unloading balloon loops. 26th July 2017.
3610 files on 181 page(s) 31

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional