Most viewed - Pilbara negative and digital Albums - Iron Ore |

275-18143 viewsFinucane Island, BHP Iron Ore's CM40-8 locomotive 5646 'White Springs' arrives at the island across the -0.8 km grade crossing and the No. 6 switch where the balloon loops rejoins the mainline. The elevated conveyor is for the HBI plant. August 10, 2003.
|
|

FC7 160306 1382142 viewsRobe River flat waggon FC 7. Greenpool March 6, 2016.
|
|

2065 Mt Newman Mining Workshops 257-12142 viewsFlash Butt yard, view of stored out of service LocoTrol waggon 2065, converted from a Comeng WA build ore waggon.
|
|

3350 Astra Vagoane 040809 161442142 viewsNelson Point, empty BHP ore waggon 3350 is one of three hundred and fifty waggons built during 1988 by Astra Vagoane of Arad in Romania for Lang Hancock as part of a 'waggons for iron ore arrangement' with the then Romanian government, however only seventy-five found their way into service with BHP. August 9, 2004.
|
|

4239 Goninan 040815 165914142 viewsNelson Point Car Dumper 3, a new Goninan built ore waggon 4239, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 15th August 2004.
|
|

1709-6708 040428 142738142 viewsEmu Siding, loaded Robe River S series waggons 1709 control and 6708 slave Bradken built waggon pair from January 2001. April 28, 2004.
|
|

1081 Comeng 110414 0138141 views1081 an Index Waggon for Car Dumper 4 at Finucane Island, converted from a Comeng WA build ore waggon.
|
|

4136 UG 110414 0124141 viewsBoodarie, loaded BHP Iron Ore Waggon 4136, a United Goninan WA replacement body built September 2008. Has original Comeng build 2107s undergear. April 14, 2011.
|
|

4769 UG 040627 075316141 viewsNelson Point, damaged BHP Iron Ore waggon 4769, a United Goninan Golynx build from September 2003 with serial number 950115-050. The indexing arm on Car Dumper 3 has damaged the waggon. June 27, 2004.
|
|

3317 Astra Vagoane 040809 161538141 viewsNelson Point, loaded BHP ore waggon 3317 is one of three hundred and fifty waggons built during 1988 by Astra Vagoane of Arad in Romania for Lang Hancock as part of a 'waggons for iron ore arrangement' with the then Romanian government, however only seventy-five found their way into service with BHP. August 9, 2004.
|
|

275-10141 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' departs the service road on its way to Yarrie with an empty, on the far left the HBI beneficiation plant is visible. The loaded is running down the mainline towards Finucane Island. This scene has changed immensely since August 10, 2003.
|
|

CC8 Mt Newman Mining Workshops 240101 6723140 viewsCompressor waggon set No. 8, consisting of a compressor car closest to camera and the weighted 'ballast' waggon. Modified from former original Magor USA build ore waggons 636 and 656 and used on the end of rakes to keep the brakes of as they are run through the dumpers.
|
|

3368 Astra Vagoane 040809 161604139 viewsNelson Point, loaded BHP ore waggon 3368 is one of three hundred and fifty waggons built during 1988 by Astra Vagoane of Arad in Romania for Lang Hancock as part of a 'waggons for iron ore arrangement' with the then Romanian government, however only seventy-five found their way into service with BHP. August 9, 2004.
|
|

1595-6571 040428 142548139 viewsEmu Siding, loaded Hamersley Iron S series waggons 1595 control and 6571 slave Bradken built waggon pair from May 2001. April 28, 2004.
|
|

3208-7249 041014 105202139 viewsGecko on the double track section, on the rear of an empty train is Hameraley Iron Bradken built S series waggon pair 3208 control and 7249 slave with a build date of March 2004. October 14, 2004.
|
|

275-12139 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' an Goninan CM40-8M Alco to GE rebuild, departs the service road on its way to Yarrie with an empty, on the left is the Boodarie East interlocking cabinet, the HBI plant is visible and the beneficiation plant to its right. The loaded is running down the mainline towards Finucane Island. This scene has changed immensely since August 10, 2003, there is another line located where the bitumen road is, the HBI is gone and the is a turn wye and fuel roads pretty much behind those shrubs. August 10, 2003.
|
|

275-14139 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' an Goninan CM40-8M Alco to GE rebuild, departs the service road on its way to Yarrie with an empty, rear view of the Dash 8 radiator section or wings. August 10, 2003.
|
|

275-30139 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Goldsworthy to Finucane Island railway, then ore trains and then the daily supply train once the A class arrived. August 10, 2003.
|
|

FC 160306 1363138 viewsRobe River flat waggon. Greenpool March 6, 2016.
|
|

CC3 Mt Newman Mining Workshops 231130 6559138 viewsCompressor waggon set No. 3, consisting of a weighted 'ballast' waggon closest to camera and the compressor car. Modified from former original Magor USA build ore waggons 673 and 684 and used on the end of rakes to keep the brakes of as they are run through the dumpers.
|
|
| 6389 files on 320 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
312 |  |
 |
 |
 |
 |
 |
 |
|