Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
218-37.jpg
218-37255 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 wait their next loaded train to push out, the tail of which is visible on the left with the mine stockpile in the background.
150505_7994.jpg
150505 7994255 viewsFMG Solomon Line, zoom view looking west from the east end of Bow Siding, point indicator indicating the loop is set for the straight, back track machine in it, 233 km. Geodata: -22.0188283 118.5297867 .
150522_8191.jpg
150522 8191255 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5645 serial 8281-11/93-134 awaits the shears. Full details of this unit can be seen here .
22452.jpg
22452255 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state. This unit was subsequently scrapped. November 1992.
Jim Bisdee photo.
22667.jpg
22667255 viewsBassendean, during an Open Day at the Goninan workshops, ALCo 251 engine test facility. 20th July 1991.
Jim Bisdee photo.
242-02.jpg
242-02255 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
240-09.jpg
240-09255 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.
080621_2798.jpg
080621 2798255 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
151206_9649.jpg
151206 9649255 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, on a Gavin Transport Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
080116_1364.jpg
080116 1364255 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
207-27.jpg
207-27254 viewsHardie Siding, BHP unit 5669 'Builen' serial 8412-02 / 95-160 is the highest numbered CM40-8MEFI rebuild by Goninan in the BHP roster, leading an empty train as it takes the passing track to effect a cross.
222-08.jpg
222-08254 viewsGreen Tank Pool, Pilbara, Western Australia. Geo Data.
225-09.jpg
225-09254 viewsBing siding, signal post BGN 3 stand sentinel as the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
232-05.jpg
232-05254 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
170728_09716.jpg
170728 09716254 views38 km on approach to Harding Siding an empty train rounds the curve under the Water Corp pipe bridge lead by Rio Tinto stripe liveried unit 8147 serial 58728 an General Electric built ES44DCi unit with a sister unit 8149 sandwiching 7065 a Dash 9-44CW unit. 28th July 2017. GeoData.
170730_0518.jpg
170730 0518254 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port with mid-train remote unit General Electric built ES44ACi unit RHA 1021 serial 64302 sandwiched within 224 waggons. 30th July 2017. GeoData.
040407_075058.jpg
040407 075058254 viewsMooka Siding, Mooka North location relay room with solar panel array on the north side, arrival LED type signal MAN 3 visible beside the mainline. 7th April 2004.
040407_075405.jpg
040407 075405254 viewsMooka Siding, north end looking north, 31.4 km showing the standard layout of the track when it was single track with passing sidings, MAN 4 on the left is the mainline departure and MAN 6 in the passing track departure, all LED type. The DED 'dragging equipment detection' bars are visible along with the arrival signal and relay room. 7th April 2004.
040412_144513.jpg
040412 144513254 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon known as Golynx waggons, one of 345 such waggons constructed during 2001 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. 12th April 2004.
218-31.jpg
218-31253 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
4019 files on 201 page(s) 35

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional