Most viewed - Pilbara negative and digital Albums - Iron Ore |

222-08496 viewsGreen Tank Pool, Pilbara, Western Australia. Geo Data.
|
|

0507 Magor USA 060414 3447496 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton. The others in the fleet are 40, 60 and 100 tons. April 14, 2006.
|
|

0713 CNR - QRRS China 150619 9084496 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting.
|
|

22473496 viewsBassendean, Goninan workshops, Robe River's Comeng NSW built ALCo model M636 9422 serial C6103-2 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in March 1993. Image September 1992.
Jim Bisdee photo.
|
|

240-11496 viewsWickham, town entry statement with former Robe River Iron Associates Montreal Locomotive Works built ALCo model RSC3 serial 77737 of 1951, originally owned by New South Wales Railways as their 40 class 4006, to Robe River in 1971 as 261.001, then 1700 and finally 9401. Short hood end view on the rail plinth at the entry into town. 31st August 2002
|
|

242-09496 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

200914 7772496 viewsPilbara Railways Historical Society, ALCo built locomotive model S-2 serial 69214 built in 1940 for the Spokane, Portland and Seattle as their #21 and retired in 1964 before coming to Australia in September 1965, numbered 007 and called 'Mabel'. Retired in December 1972 and donated to the Society in 1976. 14th September 2020.
|
|

250-01496 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

6703 Mt Newman Mining Workshops 040502 085548495 viewsMooka Siding, trailing view of the 'Pony' heading south, 50 ton waggon 6703, one of three 'special' waggons converted from Magor USA built ore waggons, loaded with concrete sleepers is closet to camera.
|
|

20955495 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

23100495 viewsBassendean, Goninan workshops, loaded onto a hundred and four six wheel road transport float, Robe River rebuild GE CM40-8M unit 9422 serial 8297-03 / 93-138 is loaded awaiting transport to Cape Lambert. 9422 was rebuilt from Comeng NSW built ALCo M636 9422 serial C6103-2 from Aug 1977 and kept this number when rebuilt here. March 1993.
Jim Bisdee photo.
|
|

23711495 viewsBassendean, Goninan workshops, 'on loan' the ARHS B class shunt engine is coupled to Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5472 serial G6047-4 undergoing rebuilding into a GE CM40-8M unit, 5472 would emerge rebuilt as 5651 in August 1993. December 1992.
Jim Bisdee photo.
|
|

23713495 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, cab section on truck. December 1992.
Jim Bisdee photo.
|
|

180616 1664495 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 are tied down on the West Mainline following a total loss of air. The train pulled a coupling around the 45 car position. 16th June 2018. Geodata
|
|

180616 1744495 viewsEmu Siding, a loaded train of Q and B series ore waggons behind the lowest numbered Rio Tinto loco 7043 with serial 57094 a GE Erie built GE model Dash 9-44CW from the 10th order in HI Pilbara Iron livery leading an original ES44DCi unit 8108 and sister Dash 9-44CW unit 7058 in the same HI Pilbara Iron livery as they descend the West Mainline past EM7 and EM5 signals at the 74.88 km on they way to Cape Lambert. 16th June 2018. GeoData.
|
|

150619 9098495 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left end of 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, 5000 litre fuel tank, grinding hood between bogies with spare grinding stones or wheels above bogie.
|
|

200914 7796495 viewsPilbara Railways Historical Society, passenger carriage 'Bellary' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2143. In 1987 it was purchased by the Society and is named after a local river. 14th September 2020.
|
|

200914 7800495 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

210510 1150495 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type straddle crane carrying rail waggon RTS 003 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

219-32494 viewsGoldsworthy Siding, the rear of an empty train sits in the siding awaiting a meet. The waggons in view were designed by AE Goodwin and built by Scott's of Ipswich and Tomlinson Steel Perth.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
39 |  |
 |
 |
 |
 |
 |
 |
|