Most viewed - Pilbara negative and digital Albums - Iron Ore |

200914 iPhone IMG 8831399 viewsPilbara Railways Historical Society, in this panorama image you can see from the left 3017 a Comeng WA ALCo rebuild C636R locomotive serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985 and the former NSWGR bogie passenger carriages. 14th September 2020.
|
|

220-16398 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

222-06398 viewsGreen Tank Pool, Pilbara, Western Australia.
Geo Data.
|
|

225-09398 viewsBing siding, signal post BGN 3 stand sentinel as the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
|
|

170730 0476398 viewsBoodarie, a loaded Roy Hill train crossing the Great Northern Highway grade crossing with mid-train General Electric built ES44ACi unit RHA 1011 serial 62583. 30th July 2017. GeoData.
|
|

170730 0511398 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.
|
|

22331398 viewsBassendean, Goninan inside workshops, CM40-8M frames being modified. July 20 1991.
Jim Bisdee photo.
|
|

23711398 viewsBassendean, Goninan workshops, 'on loan' the ARHS B class shunt engine is coupled to Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5472 serial G6047-4 undergoing rebuilding into a GE CM40-8M unit, 5472 would emerge rebuilt as 5651 in August 1993. December 1992.
Jim Bisdee photo.
|
|

240-12398 viewsWickham town entry statement, concrete plinth with plaque outlining the history of the MLW built ALCo model RSC3 units operated by Robe River prior to preservation. 31st August 2002.
|
|

200914 7799398 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

250-01398 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

220-13397 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

151111 9524397 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs over the 54.04 km culvert on the West Mainline bound for Cape Lambert viewed from Table Hill.
|
|

150507 8043397 viewsFMG Solomon Line, as the Nanutarra - Wittenoom Road was realigned when this line was built, this is where the western shortcut branch of the Roebourne - Wittenoom Road crosses the line before rejoining the Nanutarra Road. A loaded train behind double General Electric Dash Dash 9-44CW Co-Co locomotives, units 010 serial no. 58187 and 014 serial no. 58191 power a loaded along the straight, there are bank engines on the rear. Geodata: -22.1617767 118.1279150 .
|
|

5946 001 Welshpool 1986Sept397 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

22661397 viewsBassendean, during an Open Day at the Goninan workshops, a new GE-7FDL-16 prime-mover and GMG187 main alternator for install into a GE CM40-8M rebuild. 20th July 1991.
Jim Bisdee photo.
|
|

23878397 viewsBassendean, Goninan workshops, an unidentified ALCo to GE CM40-8M rebuild unit, could be 5648. July 1993.
Jim Bisdee photo.
|
|

200914 7765397 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

200914 iPhone IMG 8830397 viewsPilbara Railways Historical Society, in this panorama image you can see from the left, the PWD crane, waggons and Simplex loco from Point Samson, a couple of ALCo engines, the Locotrol 'cab'; off of BHP 5663, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, former NSWGR ALCo RSC-3 Robe River Iron Associates 9405 renumbered to 4002, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. 14th September 2020.
|
|

207-31396 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M serial 4839-02 / 88-078, cab front view, with rear of empty train in siding.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
40 |  |
 |
 |
 |
 |
 |
 |
|