Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
180616_1660.jpg
180616 1660125 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9108 with serial 62539 a GE Erie built GE model ES44ACi from the 2nd order in Rio Tinto Stripes livery side view, following a total loss of air, the train is tied down while the driver walks the consist. The train pulled a coupling around the 45 car position. 16th June 2018. Geodata
6993_001.jpg
6993 001125 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
200914_7781.jpg
200914 7781125 viewsPilbara Railways Historical Society, view looking north with locomotives from the left; former Mt Newman Mining / BHP ALCo M636 5502, former Mt Newman Mining EMD F7A 5450, former Goldsworthy Mining English Electric ST95B 1 and former Hamersley Iron ALCo C-415 1000. 14th September 2020.
200914_iPhone_IMG_8830.jpg
200914 iPhone IMG 8830125 viewsPilbara Railways Historical Society, in this panorama image you can see from the left, the PWD crane, waggons and Simplex loco from Point Samson, a couple of ALCo engines, the Locotrol 'cab'; off of BHP 5663, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, former NSWGR ALCo RSC-3 Robe River Iron Associates 9405 renumbered to 4002, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. 14th September 2020.
150523_8215.jpg
150523 8215124 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
232-05.jpg
232-05124 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
040419_102145.jpg
040419 102145124 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of non-handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
050704_3970.jpg
050704 3970124 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, on the rear of a loaded ore train.
060414_3446.jpg
060414 3446124 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
050409_0385.jpg
050409 0385124 viewsShell Swagman Roadhouse, Lampson Mack Titan prime mover and eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
23712.jpg
23712124 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, hood section on truck. December 1992.
Jim Bisdee photo.
242-02.jpg
242-02124 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
240-09.jpg
240-09124 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.
180616_1773.jpg
180616 1773124 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 7047 with serial 57098 a GE Erie built GE model Dash 9-44CW from the 10th order in HI Pilbara Iron livery with heavy rust on the visor, was built in August 2006. 16th June 2018.
6984_001.jpg
6984 001124 viewsWelshpool, Goninan Open Day 27th August, 1988. New GE 7FDL-16 prime mover awaiting fitting to one of the new CM39-8 units.
Jim Bisdee photo.
220-13.jpg
220-13123 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
220-20.jpg
220-20123 viewsGoldsworthy Junction, looking north east along the Goldsworthy line as a loaded train ex Yarrie mine approaches rounding the curve, the grease pot for the curve behind the photographer is visible.
223-33.jpg
223-33123 viewsPossum Siding, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo with the crew change completed, the empty is rolling past on the passing track. 21st October 2000.
222-19.jpg
222-19123 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie.
224-05.jpg
224-05123 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.
3681 files on 185 page(s) 42

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional