Most viewed - Pilbara negative and digital Albums - Iron Ore |

180616 1744336 viewsEmu Siding, a loaded train of Q and B series ore waggons behind the lowest numbered Rio Tinto loco 7043 with serial 57094 a GE Erie built GE model Dash 9-44CW from the 10th order in HI Pilbara Iron livery leading an original ES44DCi unit 8108 and sister Dash 9-44CW unit 7058 in the same HI Pilbara Iron livery as they descend the West Mainline past EM7 and EM5 signals at the 74.88 km on they way to Cape Lambert. 16th June 2018. GeoData.
|
|

180616 1757336 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 8133 with serial 59136 a GE Erie built GE model ES44DCi from the 2nd order in Rio Tinto Stripes livery, heavily faded from acid washing, is from the third order of these units built in June 2008 at GE's Erie plant. 16th June, 2018.
|
|

207-29335 viewsHardie Siding, BHP Goninan GE rebuild CM40-8MEFI unit 5669 'Builen' serial 8412-02 / 95-160 runs down the passing track, USA built Gunderson smooth sided ore cars ex Phelps Dodge Copper Mine.
|
|

221-05335 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
|
|

222-11335 viewsBHP access road, the Toy Titan has suffered another flat tyre.
|
|

222-15335 viewsLalla Rookh gold mine head frame at sunset.
In the 1924 WA Mines Department report, it states there was a ten head battery and five cyanide vats for leaching located here GeoData.
|
|

222-17335 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train to a stand with 7066 for a crew change.
|
|

040419 102145335 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of non-handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

170730 0470335 viewsBoodarie, a loaded Roy Hill train approaches the Great Northern Highway grade crossing behind General Electric built ES44ACi units RHA 1013 serial 62585 and sister unit RHA 1014, the third and mid-train unit can be made out at the end of the rack as it curves. 30th July 2017. GeoData.
|
|

6997 001 Welshpool 19880819335 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
|
|

19800335 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, front on view of cab remains. Sept 2003.
Jim Bisdee photo.
|
|

22656335 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

242-13335 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

150619 9094335 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, grinding and driving cab unit. Filter and blower housings, water tank, electrical cabinet, grinding hood between bogies, shows bar connection between modules, and water tank and electrical cabinet on right hand unit.
|
|

110620 2283335 viewsChapman, FMG TK type fuel tank waggon TK 02 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

090121 1680335 viewsBoodarie, an FMG empty train departs the port with mismatched waggon pair slave 1169 22.6 tonnes tare and control 2368 22.9 tonne tare from the original CSR Zhuzhou Rolling Stock Works in China build from 2007.
|
|

200914 7800335 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

220-01334 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east from the 135 km post.
|
|

220-03334 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west at the points, indicator and shelter located at the 136 km or Hedland end.
|
|

222-08334 viewsGreen Tank Pool, Pilbara, Western Australia. Geo Data.
|
|
6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
43 |  |
 |
 |
 |
 |
 |
 |
|