23734.jpg
23734328 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993, view of ALCo 251 prime mover and alternator. January 1993.
Jim Bisdee photo.
242-11.jpg
242-11328 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
242-29.jpg
242-29328 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
150619_9098.jpg
150619 9098328 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left end of 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, 5000 litre fuel tank, grinding hood between bogies with spare grinding stones or wheels above bogie.
200914_7815.jpg
200914 7815328 viewsPilbara Railways Historical Society, Public Works Department crane from Point Samson wharf railway. 14th September 2020.
250-10.jpg
250-10328 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
219-32.jpg
219-32327 viewsGoldsworthy Siding, the rear of an empty train sits in the siding awaiting a meet. The waggons in view were designed by AE Goodwin and built by Scott's of Ipswich and Tomlinson Steel Perth.
220-10.jpg
220-10327 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Hedland.
223-02.jpg
223-02327 viewsRosella Siding, the HI Access Road and locked gate sign with the Toy Titan HJ75 Toyota Landcruiser. 21st October 2000.
222-13.jpg
222-13327 viewsSulphur Springs base metal area, exploration drill rig drilling, this dates from 2000-01 when Sipa Resources had the lease. Location is only approximate GeoData.
232-34.jpg
232-34327 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
239-19.jpg
239-19327 viewsView of the Yandi One primary crusher or 'mouth of the OHP' from the south side. The Jaques grizzly screen GS01 and Jaques single toggle jaw crusher are visible along with the Transmin rock breaker for when the ROM is oversize. The cab has bars on the window to prevent 'fly-rock' from smashing it. The job of the operator is a lonely one with only the momentum on the swing jaw or the occasional sparky visit to break the monotony. GeoData.
239-23.jpg
239-23327 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. GeoData.
040408_170040.jpg
040408 170040327 viewsBing Siding, Difco Ohio USA built side dump waggons, three short and one long all loaded with fines. In 1966 five short side dump waggons were originally built for Goldsworthy Mining, here we see no. 2, 3 and 1 on the rear and Mt Newman Mining long side dump waggon 701.
050410_0521.jpg
050410 0521327 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050801_4739.jpg
050801 4739327 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
050801_4740.jpg
050801 4740327 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
170730_0513.jpg
170730 0513327 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.
3584_001.jpg
3584 001327 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
22654.jpg
22654327 viewsBassendean, Goninan workshops, brand new GE CM40-8M rebuild unit for BHP Iron Ore 5634 'Boodarie' serial 8151-07 / 91-120 looks to be in the final stages of construction as it sits out side during an Open Day on 20th July 1991 with WAGR Fs 460 4-8-0 steam locomotive and Xa Class No 1405 'Warienga'. 20th July 1991.
Jim Bisdee photo.
6053 files on 303 page(s) 47

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional