Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
040408_162813.jpg
040408 162813222 viewsMooka Siding north backtrack, side view of BHP's mainline Tamper 1, Plasser Australia 09-32 CAT model with serial 306. 8th April 2004.
170728_09895.jpg
170728 09895222 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. An empty train can be seen climbing the grade up through Emu. 28th July 2017. GeoData.
23732.jpg
23732222 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
242-32.jpg
242-32222 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of roof. May 2002.
180615_1513.jpg
180615 1513222 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill mid-train units General Electric built ES44ACi model RHA 1014 serial 62586 and sister unit RHA 1004. GeoData. 15th June 2018.
180615_1574.jpg
180615 1574222 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.
6989_001.jpg
6989 001222 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
080621_2804.jpg
080621 2804222 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
200914_7819.jpg
200914 7819222 viewsPilbara Railways Historical Society, wooden decked steel frame bogie waggon from the Point Samson PWD, with what could be the Governors Carriage frame behind it? The Governors Carriage can be seen here on the Weston Langford site. 14th September 2020.
246-18.jpg
246-18222 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
219-33.jpg
219-33221 viewsGoldsworthy Siding, a loaded train powers along the mainline behind BHP C36-7M unit 5513 'Kalgan' serial 4839-02 / 88-078, an original Mt Newman Mining ALCo C636 5453 to GE C36-7M rebuild carried out by Goninan.
228-17.jpg
228-17221 viewsYandi Two, the only real land mark on the Yandi Two branchline is this bridge over an un-named creek at the YT307 km with the afternoon empty train on approach. Geodata -22.706976, 119.097651 .
151111_9535.jpg
151111 9535221 viewsThe Rio Tinto radio comms building and mast located on Table Hill.
232-32.jpg
232-32221 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
239-15.jpg
239-15221 viewsLooking down from the middling crushers to the original 'old side' bank of five tertiary crushers. Sub-Station 2 can be seen at right with the control room above that. GeoData.
040806_103206.jpg
040806 103206221 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
060414_3447.jpg
060414 3447221 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
170729_0163.jpg
170729 0163221 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
6996_001_Welshpool_19880819.jpg
6996 001 Welshpool 19880819221 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
22666.jpg
22666221 viewsBassendean, during an Open Day at the Goninan workshops, new GE-7FDL-16 prime-movers, some with GMG187 main alternators for install into a GE CM40-8M rebuilds and some GE752 AH traction motors. 20th July 1991.
Jim Bisdee photo.
4019 files on 201 page(s) 54

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional