Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
221-35.jpg
221-35213 viewsYandi One mine loadout balloon loop, view out the cab window from near new General Electric AC6000 unit 6074 serial 51066.
224-09.jpg
224-09213 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
225-03.jpg
225-03213 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach. Flashbutt yard is to the right. GeoData.
230-14.jpg
230-14213 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
151111_9547.jpg
151111 9547213 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
150523_8221.jpg
150523 8221213 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0037 with safety slogan 'Safety is a core value', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
239-10.jpg
239-10213 viewsOverview of Yandi One mine from the end of the radial stacker boom, CV21, looking south along CV20 towards the OHP. Buildings visible from the left, diesel fuel farm, sample hut, workshops beyond the power station and the offices in the background. GeoData.
239-29.jpg
239-29213 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near exit from primary jaw type crusher. GeoData.
239-30.jpg
239-30213 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near the gravity take-up tower. GeoData.
050407_0384.jpg
050407 0384213 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
23906.jpg
23906213 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
24902.jpg
24902213 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.
080116_1365.jpg
080116 1365213 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
200914_7764.jpg
200914 7764213 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
221-23.jpg
221-23212 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
221-37.jpg
221-37212 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.
228-37.jpg
228-37212 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
230-10.jpg
230-10212 viewsYandi Two balloon loop, empty car line, mid-train remote units side view, two Goninan GE CM40-8M rebuilds from different ALCo builders. 5657 'Fukuyama' serial 8412-02/94-148 is from Comeng ALCo M636 unit 5492 while 5639 'Corunna Downs' serial 8281-03/92-128 is from an AE Goodwin ALCo C636 unit 5459. Geodata -22.713725, 119.055762 .
151111_9561.jpg
151111 9561212 viewsGreen Pool, a loaded train holds the East Mainline behind triple General Electric ES44DCi units 8169, 8128 and 8163, serials of 60462, 59120 and 60227, the east line was booked out to track work between Green Pool and Harding.
239-11.jpg
239-11212 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
4019 files on 201 page(s) 63

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional