Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
151111_9543.jpg
151111 9543358 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
150505_7997.jpg
150505 7997358 viewsFMG Solomon Line, zoom view looking east from the west end of Bow Siding, point indicator indicating the switch is set for the straight. Geodata: -22.0253817 118.4933250 .
150523_8221.jpg
150523 8221358 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0037 with safety slogan 'Safety is a core value', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150523_8229.jpg
150523 8229358 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, Goninan rebuild CM40-8M 5665 shunts the waggons, its life also about to come to an end.
234-01.jpg
234-01358 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
239-11.jpg
239-11358 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
239-12.jpg
239-12358 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
040806_092732.jpg
040806 092732358 viewsGoldsworthy Junction, weighbridge test waggon 522, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
110411_10010.jpg
110411 10010358 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
170730_0490.jpg
170730 0490358 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
180615_1574.jpg
180615 1574358 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.
200914_7817.jpg
200914 7817358 viewsPilbara Railways Historical Society, axle box with WAGRYS and the year 1925 on a four wheel waggon. 14th September 2020.
247-37.jpg
247-37358 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
250-11.jpg
250-11358 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
210510_1118.jpg
210510 1118358 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type straddle crane carrying rail waggon RTS 002 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
110620_2020r.jpg
110620 2020r358 viewsWalla Siding, empty BHP ore waggon 7000, a Goninan WA build of the Golynx design from April 2008. 20th of June 2011.
219-33.jpg
219-33357 viewsGoldsworthy Siding, a loaded train powers along the mainline behind BHP C36-7M unit 5513 'Kalgan' serial 4839-02 / 88-078, an original Mt Newman Mining ALCo C636 5453 to GE C36-7M rebuild carried out by Goninan.
219-35.jpg
219-35357 viewsGoldsworthy Siding, a loaded train powers along the mainline behind BHP C36-7M unit 5513 'Kalgan' serial 4839-02 / 88-078, with some Gunderson USA built smooth sided waggons ex-Phelps Dodge Copper Mine.
226-35.jpg
226-35357 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
228-06.jpg
228-06357 viewsYandi One, a loaded train creeps towards the Y308.1 km grade crossing while loading a train at 0.9 km/h. Goninan GE CM40-8MEFI rebuild unit 5667 'Redcar' serial 8412-12/94-158 leads an unidentified CM40-8 new build unit, either 5646 or 5647.
6096 files on 305 page(s) 66

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional