Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
224-14.jpg
224-14296 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, radiator, steerable bogie and taper in cab side. GeoData.
228-04.jpg
228-04296 viewsYandi One, a loaded train coming off the balloon loop, this area is near the new MAC Junction. Stockpile and radio repeater in the background.
229-29.jpg
229-29296 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
230-14.jpg
230-14296 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
151111_9528.jpg
151111 9528296 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
150523_8209.jpg
150523 8209296 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150523_8245.jpg
150523 8245296 viewsNelson Point Yard, loaded ore waggon 9040, a Golynx style waggon built by Goninan in 2005 with asset number of 203485 out of 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
040815_171312.jpg
040815 171312296 viewsNelson Point, fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
060429_3718.jpg
060429 3718296 viewsFlash Butt yard, a view along the Harsco 'Pony' track resleeping and relaying machine and sleeper carting waggons and gantry trolleys.
040407_073324.jpg
040407 073324296 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line past the dual headed GJ 9 signal. 7th April 2004
050414_0945.jpg
050414 0945296 viewsFlash Butt yard, Speno Australia's double RR24 rail grinder setup for BHP. Front unit is serial M20. These were later numbered as RG 1 and RG 2 respectively. 14th April 2005.
130720_1461.jpg
130720 1461296 viewsFlash Butt yard, new heavyweight out of gauge flat waggon 6000, unsure of builder, could be Gemco Rail in Perth.
150729_9457.jpg
150729 9457296 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
170729_0288.jpg
170729 0288296 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 have crossed the 96.2 km grade crossing. 29th July 2017. GeoData.
060723_7763.jpg
060723 7763296 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
23733.jpg
23733296 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
23906.jpg
23906296 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
170915_0719.jpg
170915 0719296 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1012 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
170915_0721.jpg
170915 0721296 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1004 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
241-01.jpg
241-01296 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
5972 files on 299 page(s) 69

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional