Most viewed - Pilbara negative and digital Albums - Iron Ore |

200914 7820355 viewsPilbara Railways Historical Society, three four wheel waggons from the Point Samson PWD. All the PWD stock was of 3' 6" gauge. 14th September 2020.
|
|

247-02355 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
|
|

210510 1133355 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

283-22355 viewsHarding Siding, quad Robe River CM40-8M units all rebuilt by Goninan from various ALCo models show their tank and bogie differences here. 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

218-33354 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7090 serial 47769 in the delivered 'Pepsi Can' livery.
|
|

222-04354 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train departing behind two General Electric AC6000 units built by GE at their Erie plant. Gillam Siding is at the 97.1 km. GeoData.
|
|

222-18354 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train to a stand with 7071 for a crew change.
|
|

151111 9547354 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
|
|

150523 8215354 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

050518 2124354 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows ownership plaque.
|
|

050414 0945354 viewsFlash Butt yard, Speno Australia's double RR24 rail grinder setup for BHP. Front unit is serial M20. These were later numbered as RG 1 and RG 2 respectively. 14th April 2005.
|
|

150729 9457354 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
|
|

060723 7828354 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. 23rd July 2006.
|
|

242-15354 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

180615 1555354 viewsWalla Siding, BHP Billiton mid-train units 4396 serial 20118575-006 and 4436 serial 20128866-005 both SD70ACe units built by Progress Rail, Muncie USA. 15th June 2018.
|
|

080116 1367354 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, looking south along the rake with 1395 closest to the camera. 16th January 2008.
|
|

110620 2282354 viewsChapman, FMG TK type fuel tank waggon TK 03 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

200914 7786354 viewsPilbara Railways Historical Society museum, bogie view of former Cliffs Robe River Iron Associates RSC-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
|
|

200914 7816354 viewsPilbara Railways Historical Society, four wheel waggon showing chopper coupler and chains of the this un braked rollingstock. 14th September 2020.
|
|

246-37354 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
70 |  |
 |
 |
 |
 |
 |
 |
|