Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
151111_9577.jpg
151111 9577290 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
238-04.jpg
238-04290 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
239-36.jpg
239-36290 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
050704_3974.jpg
050704 3974290 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, view of A end and bogie detail.
060429_3729.jpg
060429 3729290 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining on the 24th September 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
060429_3741.jpg
060429 3741290 viewsFlash Butt yard, Pony re-laying waggon 6702 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
060710_6302.jpg
060710 6302290 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 567, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
050409_0393.jpg
050409 0393290 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
160128_00333.jpg
160128 00333290 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0023, one of a batch of ten built in 2014.
170510_8282.jpg
170510 8282290 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
170915_0720.jpg
170915 0720290 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1008 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
241-16.jpg
241-16290 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side cab front view with plough removed. June 2002.
241-31.jpg
241-31290 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.
080124_1627.jpg
080124 1627290 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
247-12.jpg
247-12290 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
218-25.jpg
218-25289 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine.
220-28.jpg
220-28289 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
224-09.jpg
224-09289 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
227-25.jpg
227-25289 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
228-05.jpg
228-05289 viewsYandi One, a loaded train creeps towards the Y308.1 km grade crossing while loading a train at 0.9 km/h. Goninan GE CM40-8MEFI rebuild unit 5667 'Redcar' serial 8412-12/94-158 leads an unidentified CM40-8 new build unit, either 5646 or 5647.
5972 files on 299 page(s) 75

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional