Most viewed - Pilbara negative and digital Albums - Iron Ore |

0226 CNR - QRRS China 150729 9458435 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0226, loaded with ballast.
|
|

23761435 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M and the ARHS former WAGR B class shunt engine. January 1993.
Jim Bisdee photo.
|
|

241-01435 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

241-07435 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation, cab side view. June 2002.
|
|

04266 110620 2218435 viewsForrest Siding near the 126 km, detail shot of empty FMG ore waggon 4266 showing the builders plate, RFID tag, number decal and bogie detail. CNR QRRS of China built waggon dating from 2011. 20th June 2011.
|
|

247-21435 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
|
|

249-37435 viewsBurrup Peninsula gas plant, view of storage tanks, plant and visitors centre. Approximate location. 18th December 1999.
|
|

267-21435 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
|
|

267-35435 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands on the Newman mainline with the train as the party alight for an inspection of the site. Friday 12th of April 2002.
|
|

220-28434 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
|
|

221-32434 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

230-09434 viewsYandi Two balloon loop, empty car side, side view of two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. Geodata -22.713725, 119.055762 .
|
|

150523 8221434 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0037 with safety slogan 'Safety is a core value', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

232-34434 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

239-27434 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.
|
|

239-34434 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
|
|

0020 Comeng NSW 040815 171420434 viewsNelson Point, view of access ladder, brake valve and discharge piping of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

CHRY 761 050518 2104434 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761.
|
|

0520 Magor USA 050518 2179434 viewsBing Siding. Side view of 1963 built Magor USA waggon 520, the last of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

6015 Comeng WA 050522 2736434 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #26, 6015, built by Comeng WA in November 1971.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
75 |  |
 |
 |
 |
 |
 |
 |
|