Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
040805_095714.jpg
040805 095714117 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
040806_102928.jpg
040806 102928117 viewsFlash Butt yard, rear view of stored out of service LocoTrol waggon 2626 showing number board and the short hood end.
040815_171246.jpg
040815 171246117 viewsNelson Point, side view of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
060414_3439.jpg
060414 3439117 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
050410_0521.jpg
050410 0521117 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
060403_3273.jpg
060403 3273117 viewsTabba North, Barclay Mowlem high-rail Pettibone model 445-E Speed Swing, with the moniker Skinny's Bone. 3rd April 2006.
060501_3929.jpg
060501 3929117 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
170729_0135.jpg
170729 0135117 viewsGreen Pool, an empty Rio Tinto iron ore train runs along the Lyndon River behind General Electric built ES44DCi unit 8184 serial 60782 and a pair of Pilbara Iron liveried with HI reporting marks General Electric built Dash 9-44CW units 7045 and 7049. 29th July 2017. GeoData.
080116_1381.jpg
080116 1381117 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
200412_5921.jpg
200412 5921117 viewsBoodarie, part of a loaded FMG train, a mismatched waggon pair, both are CSR Yangtze Rolling Stock Co. of China builds, 6968 would be a 2013 built, but the 5967 should be a 2014 build and numbered in the 72xx-74xx series. 12th April 2020.
247-18.jpg
247-18117 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper from the South Yard at Bells Crossing. Approximate location of train is here. 22nd May 2002.
267-23.jpg
267-23117 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
224-25.jpg
224-25116 viewsBing siding, the afternoon empty to Yandi waits in the loop as a loaded behind two Goninan rebuilt CM40-8M GE units rolls through on the mainline, 5642 'Wallareenya' serial 8281-07 / 92-131 leads sister unit 5637. GeoData.
226-29.jpg
226-29116 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.
229-01.jpg
229-01116 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-15.jpg
229-15116 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
230-09.jpg
230-09116 viewsYandi Two balloon loop, empty car side, side view of two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. Geodata -22.713725, 119.055762 .
232-29.jpg
232-29116 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
234-02.jpg
234-02116 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
234-17.jpg
234-17116 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 builders plate. Circa 1998.
3983 files on 200 page(s) 75

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional