Most viewed - Pilbara negative and digital Albums - Iron Ore |

080116 1369203 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
|
|

246-01203 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the siding on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. The original line or Mainline is the second from the camera, with the car dumper one Empty Car line closest, and what becomes the car dumper two Loaded Car line is third. 22nd May 2002.
|
|

249-33203 viewsLoaded Hamersley Iron ore waggon pair National Steel USA built 5126 and Nippon Sharyo Japan built 770. Approximate location. 18th December 1999.
|
|

268-29203 viewsAt the 39 km detection site with the Alstom 25-year special, left hand side view of the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

283-22203 viewsHarding Siding, quad Robe River CM40-8M units all rebuilt by Goninan from various ALCo models show their tank and bogie differences here. 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

221-28202 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

226-35202 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|

229-15202 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

238-17202 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
|
|

238-20202 viewsNelson Point loco overhaul shop sees former Southern Pacific loco 3079 EMD model SD40, serial number 7861-52 with the long hood removed due to the 645 prime mover failing not long after arrival in Australia. 27th January 2004. Geodata .
|
|

060414 3442202 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car.
|
|

050412 0818202 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

130720 1461202 viewsFlash Butt yard, new heavyweight out of gauge flat waggon 6000, unsure of builder, could be Gemco Rail in Perth.
|
|

241-01202 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

241-06202 viewsNelson Point, Goninan GE rebuild C36-7M units 5506 serial 4839-01 / 87-071 and 5510 serial 4839-07 / 87-075 are in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This view from the radiator of 5506 looking at 5510 shows the difference in the Dash 7 radiator on 5506 and the Dash 8 radiator fitted to 5510 following collision repairs. June 2002.
|
|

150619 9097202 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left filter housing, 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hoods beside bogie.
|
|

200914 7820202 viewsPilbara Railways Historical Society, three four wheel waggons from the Point Samson PWD. All the PWD stock was of 3' 6" gauge. 14th September 2020.
|
|

210321 9303202 viewsBoodarie on the 5 km curve loaded FMG slave ore waggon 5745 was built by CSR Yangtze with a prototype pressed lower panels and is joined to 6746. This pair is the same as 3005 - 4006. 21st March 2021.
|
|

267-27202 views39 km Newman line, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 slows as it brings the Sundowner special to a stop at the 39 km detector site on the Newman mainline.
The trailing unit is 5653.
This was a special for the 25 years of the Alstom / BHP service agreement.
Friday 12th of April 2002.
|
|

222-23201 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie brings an empty train to a stop with 7091 for a crew change besides a loaded headed up by 7071.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
75 |  |
 |
 |
 |
 |
 |
 |
|